
21.0 Maintenance
Function
Temperature Calibration
Test using the calibration port fitted at the rear
using certified equipment (frequency dependent
on the standard required). Please contact Car-
bolite Gero Service if no port has been fitted
Operational Check
Check that all functions are working normally
Operational Check
Thorough inspection and report incorporating a
test of all functions
Performance
Element Circuit
Electrical measurement
Power Consumption
Measure the current drawn on each phase / cir-
cuit
Balance Pan Extension
Visually check to make sure the pan is level and
undamaged. With an empty chamber, make sure
the balance reading is stable
72
Содержание CARBOLITE GERO ABA 7/35B
Страница 11: ...2 2 Identifying the Parts 11 2 0 Supplied Item List ...
Страница 13: ...Fig 7 Front brick cover Fig 8 Calibration Plate Fig 9 Functional parts of the ABA 13 2 0 Supplied Item List ...
Страница 19: ...Fig 14 Schematic for Mains Electrical Connections 19 3 0 Installation ...
Страница 40: ...7 0 Running a Test Fig 46 Screen view Weight Entry Number Pad Fig 47 Screen view Successful Weight Entry 40 ...
Страница 57: ...Fig 61 Screen view Standard Recipe Fig 62 Calibration Recipe 57 14 0 Recipe Editor ...
Страница 70: ...20 0 Temperature Calibration Fig 72 Screen view Dual Point Calibration 70 ...
Страница 93: ...Notes Service Record Engineer Name Date Record of Work ...