
21.0
Maintenance
21.1
General Maintenance
Preventive rather than reactive maintenance is recommended. The type and frequency
depends on the product use; the following are recommended.
21.2
Maintenance Schedule
CUSTOMER
QUALIFIED PERSONNEL
DANGER! ELECTRIC SHOCK
. Risk of fatal injury. Only electrically
qualified personnel should attempt these maintenance procedures.
Maintenance
Procedure
Method
Frequency
Daily Weekly Monthly
Bi-
Annually
Annually
Safety
Safety Switch Function
Set a safe temperature above ambient, and open
the door to make sure the bottom two heater
lights for the main chamber go out
Safety Switch Function
With the mains supply to the furnace switched
off, ensure that the door is locked
Safety Switch Function
Electrical measurement
Safety Circuit Test Switch
Test the operation of the ‘Electric Shock Warning
Lights’ by operating the ‘Safety Circuit Test
Switch’ as described in this manual
Door Plug
Visual inspection, checking the seal and whether
it is free of damage
Door Plug
Replacement where necessary
Door Seal
Visual inspection - check for splits or fraying
Door Seal
Replacement
Chimney / Extraction
Check inside the plenum chamber as described
in this manual, and clean if necessary
Chimney / Extraction
Clean inside the plenum chamber, including care-
fully removing the build-up of debris in the
blades of the extraction fan.
Electrical Safety (external)
Visual check of external cables and plugs
Electrical Safety (internal)
Physically check all connections and cleaning of
the power plate area
71
21.0 Maintenance
Содержание CARBOLITE GERO ABA 7/35B
Страница 11: ...2 2 Identifying the Parts 11 2 0 Supplied Item List ...
Страница 13: ...Fig 7 Front brick cover Fig 8 Calibration Plate Fig 9 Functional parts of the ABA 13 2 0 Supplied Item List ...
Страница 19: ...Fig 14 Schematic for Mains Electrical Connections 19 3 0 Installation ...
Страница 40: ...7 0 Running a Test Fig 46 Screen view Weight Entry Number Pad Fig 47 Screen view Successful Weight Entry 40 ...
Страница 57: ...Fig 61 Screen view Standard Recipe Fig 62 Calibration Recipe 57 14 0 Recipe Editor ...
Страница 70: ...20 0 Temperature Calibration Fig 72 Screen view Dual Point Calibration 70 ...
Страница 93: ...Notes Service Record Engineer Name Date Record of Work ...