
If sited in a prefabricated or mobile laboratory additional stiffening of the floor may be
required to ensure stability of the internal weighing system.
If the optional metal stand (part number 00372-3-4000) is supplied, this is best placed
on a solid (concrete) floor.
Ensure that the product is placed in such a way that it can be quickly switched off or
disconnected from the electrical supply.
Under no circumstances should any objects be placed on top of the product.
Always ensure that any vents on the top of the product are clear of any
obstruction. Always ensure all cooling vents and cooling fans (if fitted) are
clear of any obstruction.
3.3
Tools Required
l
10 mm spanner
l
12 mm spanner
l
Cross point screwdriver
l
Flat blade screwdriver
l
Allen key (supplied)
l
5 kg calibration mass (not supplied)
l
Spirit level (supplied)
15
3.0 Installation
Содержание CARBOLITE GERO ABA 7/35B
Страница 11: ...2 2 Identifying the Parts 11 2 0 Supplied Item List ...
Страница 13: ...Fig 7 Front brick cover Fig 8 Calibration Plate Fig 9 Functional parts of the ABA 13 2 0 Supplied Item List ...
Страница 19: ...Fig 14 Schematic for Mains Electrical Connections 19 3 0 Installation ...
Страница 40: ...7 0 Running a Test Fig 46 Screen view Weight Entry Number Pad Fig 47 Screen view Successful Weight Entry 40 ...
Страница 57: ...Fig 61 Screen view Standard Recipe Fig 62 Calibration Recipe 57 14 0 Recipe Editor ...
Страница 70: ...20 0 Temperature Calibration Fig 72 Screen view Dual Point Calibration 70 ...
Страница 93: ...Notes Service Record Engineer Name Date Record of Work ...