
5. Operation
ROBOT HP7C / HP10C / HP15C / HP17C
5-3
© VEMAG 2004
• If you want to use the machine to link, test the relevant linking horn for
concentricity with the aid of the respective program.
Portioning computer user guide
• Use the portioning computer to select a filling program and check
whether the double screws are correctly selected in the portioning
computer.
Portioning computer user guide
• Set the vacuum required for the product to be filled at the vacuum
reducing valve. Put the blind plug in the double screw housing if
necessary.
Section 4
Warning!
You must interrupt the filling process and check the seals of the double
screw drive if vacuum level falls uncontrollably during production.
Sections 6 and 7
• At the start, allow the machine to run at a slow speed (max. 20 %) until
product escapes at the outlet.
This prevents the pumping element “running dry”. When filling hot
products, wait about 1 minute to start production. This ensures that all
machine parts which come into contact with the product are heated to
product temperature.
• Operate the knee lever to start the filling process.
When production is finished, proceed as follows:
• Press the OFF key on the machine control panel.
• Switch off the main switch of the machine.
• Clean the machine in accordance with the instructions in the cleaning
schedule.
Section 6
• Take the appropriate maintenance measures if necessary.
Section 7
Содержание ROBOT HP7C
Страница 6: ...Index iv VEMAG 2004 ROBOT HP7C HP10C HP15C HP17C...
Страница 8: ...0 Foreword 0 2 VEMAG 2004 ROBOT HP7C HP10C HP15C HP17C...
Страница 20: ...2 Description ROBOT HP7C HP10C HP15C HP17C 2 8 VEMAG 2004...
Страница 30: ...3 Installation and commissioning ROBOT HP7C HP10C HP15C HP17C 3 10 VEMAG 2004...
Страница 82: ...8 Troubleshooting 8 4 ROBOT HP7C HP10C HP15C HP17C VEMAG 2004...