3. Installation and commissioning
ROBOT HP7C / HP10C / HP15C / HP17C
3-1
© VEMAG 2004
3. Installation and commissioning
3.1 Transporting the machine
The machine may only be transported using suitable lifting trucks or fork-
lift trucks with a capacity of at least 1,500 kg. If at all possible, move the
fork-lift/lifting truck under the machine from the outlet side.
Danger!
Never tilt the machine when transporting it and when setting it up, always
keep it horizontal. This prevents the machine tipping over. When
transporting the machine, it is essential to observe its centre of gravity.
Fig. 3-1
Centre of gravity of the
machine
960
410
Fig. 3-2
Centre of gravity of the
machine
960
410
Содержание ROBOT HP7C
Страница 6: ...Index iv VEMAG 2004 ROBOT HP7C HP10C HP15C HP17C...
Страница 8: ...0 Foreword 0 2 VEMAG 2004 ROBOT HP7C HP10C HP15C HP17C...
Страница 20: ...2 Description ROBOT HP7C HP10C HP15C HP17C 2 8 VEMAG 2004...
Страница 30: ...3 Installation and commissioning ROBOT HP7C HP10C HP15C HP17C 3 10 VEMAG 2004...
Страница 82: ...8 Troubleshooting 8 4 ROBOT HP7C HP10C HP15C HP17C VEMAG 2004...