Electrical Set-up
Electrical Set-up
WARNING
1. Always check that the isolator in the mains supply to the gate is in the OFF position, before doing any
work.
2. Ensure that all low voltage systems (Less than 42.4V) are suitably protected from damage, by
disconnecting all sources of power such as chargers and batteries before doing any work.
3. All electrical work must be carried out according to the requirements of all applicable local electrical
codes. (It is recommended that a licensed electrical contractor perform such work.)
Page 26
1. Secure the control box to wall using the most
appropriate means.
Secure control box to wall
Step 1
CONTROL BO
X
PREFERABL
Y MOUNTED
A
T EYE LEVEL
Be sure to position the wall box so as not to
cause any hazards during and after the
installation.
Preferably mount the wall box:
• Out of direct sunlight.
• At a comfortable working height.
• Away from garden sprinklers etc.
• To allow easy access even when the
gate is open.
Page 27
2. Connect all the cables as required to the
control card. See page 46 and page 47.
3. When wiring each operator back to the
controller housing, it is recommended to
mount a small junction box adjacent each
operator. Terminate the cable provided on the
operator into this junction box and then route a
new cable from the junction box to the
controller housing.
Connect all wiring
For wiring diagram see page 46/47
Figure 15 Wiring Diagram
Figure 15 Wiring Diagram
15
15
15
15
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
MASTER
SLAVE
BLACK
BLACK
RED
RED
BLUE
BLUE
PURPLE
PURPLE
BLACK
BLACK
RED
RED
BLUE
BLUE
PURPLE
PURPLE
BLACK
BLACK
RED
RED
BLUE
BLUE
PURPLE
PURPLE
PURPLE
PURPLE
BLUE
BLUE
MASTER
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
THIN PURPLE
THIN RED or GREY
THICK BLUE
THICK BLACK
THIN BLUE or ORANGE
THIN BLACK
SLA
VE
S Sens1
S Sens2
M Sens1
M Sense2
Sens+
Sens-
Saf CLO
Saf OPE
Com
LCK/STP
TRG
PED
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
Light
Light
Batt +
Bat -
MTR M+
MTR —
MTR S+
MTR S-
THIN PURPLE
THIN RED or GREY
THICK BLUE
THICK BLACK
THIN BLUE or ORANGE
THIN BLACK
Wiring Diagram for Basic Operation
Wiring Diagram for Basic Operation
Page 36
Page 36
Page 37
Page 37
JUNCTION
BOX
Light
Light
Batt +
Batt -
MTR M+
MTR M -
MTR S+
MTR S -
Com
FRX
LIT
LED
Com
Aux 12V
Com Saf
Sol
4. Check that the charger and battery are
connected to the controller.
Ensure the battery polarity is correct.
5. Switch on the mains supply (via isolator).
6. Ensure that both the controller and charger are
effectively earthed for improved lightning
protection.
Setting the limits
7. Check that the origin has been correctly set.
(See page 21)
open
8. Check that the gate is closed and the operator is
locked.
S Sens1
S Sens2
M Sens1
M Sens2
Sens+
Sens-
Safe CLS
Safe OPN
Com
LCK/STP
TRG
PED
3
3
3
3
3
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
Exit
Go
Up/Dn
AutoClose
AutoClose
AutoClose
AutoClose
AutoClose
9. If powering up the system ex-factory, it will
request for the operating PROFILE
(operating standard) to be set. Select from
the list the PROFILE that will suit the specific
region. With this set, the system will
automatically proceed to the limit setup menu.
Follow the on-screen instructions to complete
the set-up procedure.
If the powering up with the PROFILE set but
no limits set, the system will automatically
proceed to the limit setup menu. Follow the
on-screen instructions to complete the set-up
procedure.
If powering up at any stage after that, push
and hold the SETUP button (-----) for 3
seconds.
Select the “limits” menu by pressing the ENTER
button (-----).Follow the on-screen instructions to
complete the set-up procedure.
♀
♀
For more details about the PROFILE (operating standard)
refer to page 37.
i)
ii)
iii)