4. Installation Procedures
Green21 (Model: PCT-90LH) Installation Manual
31
EN
G
LISH
2. Tighten two bolts on the rear side as shown in the following figures.
Wrench Bolt
Part No.: 26
w/spring
Size: M10 x 30
Qty.: 2 ea
Figure 4-16. Tightening two bolts on the rear side
3. Connect the cables to the rear side of the Handle Frame referring to
Section 0.
Содержание Green 21 PCT-90LH
Страница 1: ...User Manual Model PCT 90LH Version 1 49 Full version English...
Страница 2: ......
Страница 13: ...Table of Contents Green21 Model PCT 90LH Installation Manual 1 ENGLISH This Page Left Blank Intentionally...
Страница 14: ...0 Table of Contents 2 Green21 Model PCT 90LH Installation Manual This Page Left Blank Intentionally...
Страница 32: ...3 Before the Installation 20 Green21 Model PCT 90LH Installation Manual This Page Left Blank Intentionally...
Страница 68: ...4 Installation Procedures 56 Green21 Model PCT 90LH Installation Manual This Page Left Blank Intentionally...
Страница 111: ...8 Acquiring a Test Image Green21 Model PCT 90LH Installation Manual 99 ENGLISH This Page Left Blank Intentionally...
Страница 115: ...9 Technical Specifications Green21 Model PCT 90LH Installation Manual 103 ENGLISH This Page Left Blank Intentionally...
Страница 127: ......
Страница 128: ......