INSTALLATION OF THE HORIZONTAL AIR/FLUE DUCT
Horizontal air/flue duct
Accy No.: 303 930
for ecoMAX only
(Length 0.8 m)
Contents of the accessory:
• Horizontal air/flue duct
• 87° elbow
• 1 x 70 mm air duct clamp
• 1 x 40 mm air duct clamp
• Internal trim ring Ø 100
• External wall seal
Fig. 3.1: Horizontal air/flue conduit
IMPORTANT:
The flue hole should be cut with a
slight rise to outside if 3° ± 1°
(equivalent to 50 mm ± 20 mm rise
per metre length).
Preparation
• Determine the installation site for
the boiler with reference to the
installation and servicing
instructions supplied with the
boiler.
• Ensure that all installation and
service clearances are available
and that the boiler flue can be
installed as detailed in these
instructions.
• Fix the paper template, supplied
with the boiler, to the wall
ensuring that the centreline of the
template is vertical using a
plumbline or spirit level.
Top outlet flue exiting to rear
• For installations where the air/flue
duct is to be installed directly to
the rear of the boiler, the
installation template details the
position of the flue exit hole for
horizontal top outlet installation.
Top outlet flue exiting to side
• For installations where the air/flue
duct is to be installed to the side,
the position of the flue exit hole
can be determined by carefully
levelling across the wall from the
centre line of the air/flue duct
hole marked on the template.
• The position of the flue exit hole
should allow the flue to be
installed with a slight upward
slope of about 3° ± 1° (equivalent
to 50 mm ± 20 mm per metre of
flue duct). Calculate the required
rise according to the flue length
and mark the position of the flue
exit hole.
40
13
70
800
95
LAS Euro B/S 037/0
3
*
150
2
4
1
5
Fig. 3.2
LAS Euro B/S 072/0GB
*
*
= 190 mm ecoMAX
combination and system boilers
*
= 176 mm ecoMAX pro
☞
Observe the maximum flue
lengths as detailed in table on
page 11.
PA
R
T 1 CONCENTRIC 60/100
834449_05GB_022005.qxd 02.02.2005 17:12 Uhr Seite 15
Содержание ecoMAX 618/2 E
Страница 2: ...834449_05GB_022005 qxd 02 02 2005 17 12 Uhr Seite 2...
Страница 58: ...Notes 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 58...
Страница 59: ...Notes 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 59...
Страница 60: ...834449_05 GB 02 2005 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 60...