background image

28

INSTALLATION OF THE VARIABLE TERMINATION KIT

• Fit the pipes and bends, working

from the variable terminal to the
selected location for the flue exit
using support clips supplied fig
4.8, 4.9, 4.10 or 4.11.

Caution!

Pipe extensions must be fixed to the
wall using pipe clamps. Use one
clamp for each extension directly
beside the sleeve. Fit another clamp
to the extension after each 87° bend 
(fig. 4.9).

Caution!

The extension pipe expands when
heated. 
Leave 1 cm expansion space in each
sleeve.

Please note: The maximum flue
lengths where the variable
termination kit is installed are
shown in the tables on pages 11
and 12.

Please note: The parts are simply
pushed together (not bolted).

Caution!

Fasten the 87° bend with bird
protection grille using a separate
pipe clamp (fig. 4.9). 

Caution!

If installed near a light, insects may
fly into the opening. Tell the
homeowner to clean the opening
regularly.

Danger!

Before starting up the appliance,
check that the entire flue pipe is
firmly seated and sealed.

Caution!

During annual maintenance, check
the flue system for
-

visible defects, such as
embrittlement or damage

-  tight connection of the pipes
-  dirt in the air intake and flue exits

due to leaves, insects etc.

Fig. 4.9:  Bird protection grille

Fig. 4.8:  Basic installation

834449_05GB_022005.qxd  02.02.2005 17:12 Uhr  Seite 28

Содержание ecoMAX 618/2 E

Страница 1: ...4 2 E ecoMAX 828 2 E ecoMAX 835 E ecoMAX pro 18 E ecoMAX pro 28 E ecoTEC plus 612 3 ecoTEC plus 615 3 ecoTEC plus 618 3 ecoTEC plus 624 3 ecoTEC plus 630 3 ecoTEC plus 824 3 ecoTEC plus 831 3 ecoTEC p...

Страница 2: ...834449_05GB_022005 qxd 02 02 2005 17 12 Uhr Seite 2...

Страница 3: ...entric Systems 60 100 Galvanized steel air duct plastic flue duct PART 2 Pages 37 57 Optional Concentric System 80 125 Galvanized steel air duct plastic flue duct PART 2 CONCENTRIC 80 125 PART 1 CONCE...

Страница 4: ...rved 5 Alternative termination accessories available 6 Maximum flue lengths for ecoMAX 11 Maximum flue lengths for ecoTEC 12 Installation of the vertical air flue duct 31 Installation of the horizonta...

Страница 5: ...ith CORGI The Council for Registered Gas Installers The installation of the boiler and flue must be in accordance with the Gas Safety Installation and Use Regulations 1998 and the Building Regulations...

Страница 6: ...No 303 900 303 919 303 906 303 902 303 903 303 905 303 911 x 303 910 303 821 303 915 009076 black x x x x x x x x x 303 930 303 933 Black terminal kit for horizontal air flue duct 303 934 Adjustable...

Страница 7: ...nts 60 100 Elbow 87 60 100 Vaillant Accy No 303 910 Bends 45 pack of 2 60 100 Vaillant Accy No 303 911 Air flue duct extension 470 mm 60 100 Vaillant Accy No 303 902 Air flue duct extension 970 mm 60...

Страница 8: ...Offset section 60 100 Vaillant Accy No 303 919 303919_IAx 498 132 255 Fig 1 8 Adjustable roof tile for pitched roof Adjustable roof tile for pitched roof Vaillant Accy No 009 076 black GU_LAZ 41 0 44...

Страница 9: ...lack Vaillant Accy No 303 942 For 303 933 and 303 936 only Variable termination kit white Vaillant Accy No 303 946 For 303 933 and 303 936 only Black terminal kit for horizontal air flue duct Vaillant...

Страница 10: ...No 303 944 87 elbow for variable termination kit white including 1 support clip Vaillant Accy No 303 949 Fig 1 13 Extension 60 1 m pipe Extension pipe for variable termination kit 60 mm 1 m black inc...

Страница 11: ...ue lengths for use with ecoMAX Accessories Accy No 828 2 E 635 E 835 E pro 18 E pro 28 E 824 2 E 613 2 E 618 2 E 622 2 E ecoMAX Maximum length of flue is reduced by 1 0 m for each additional 87 elbow...

Страница 12: ...2 plus 615 plus 618 ecoTEC Maximum length of flue is reduced by 1 0 m for each additional 87 elbow Maximum length of flue is reduced by 0 5 m for each additional 45 elbow Vertical flue systems 303 900...

Страница 13: ...LAS Euro B S 074 0 Fig 1 17 Horizontal flue systems Fig 1 18 Vertical flue systems PLANNING THE AIR FLUE DUCT LAYOUT Concentric flue length Flue length outside Fig 1 19 Horizontal flue system install...

Страница 14: ...air duct Pull back the sliding sleeve so that it engages into the socket 3 of the boiler 4 Ensure that the sliding sleeve penetrates the socket such that there is at least 20 mm engagement at both end...

Страница 15: ...it level Top outlet flue exiting to rear For installations where the air flue duct is to be installed directly to the rear of the boiler the installation template details the position of the flue exit...

Страница 16: ...emove any burrs with a file this ensures easy fitting of the ducts and prevents any rough edges from damaging the flue seals Care should be taken not to scratch the white surface of the air duct If th...

Страница 17: ...the flue socket on the boiler and secure using the 40 mm air duct clamp 4 provided Pull the air flue duct back through the wall such that the flue duct fully engages into the flue elbow socket Fit the...

Страница 18: ...e for horizontal top outlet installation Top outlet flue exiting to side For installations where the air flue duct is to be installed to the side the position of the flue exit hole can be determined b...

Страница 19: ...e this ensures easy fitting of the ducts and prevents any rough edges from damaging the flue seals Care should be taken not to scratch the white surface of the air duct If the installation requires th...

Страница 20: ...ue elbow into the flue socket on the boiler and secure using the 30 mm air duct clamp 4 provided Pull the air flue duct back through the wall such that the flue duct fully engages into the flue elbow...

Страница 21: ...horizontal top outlet installation Top outlet flue exiting to side For installations where the air flue duct is to be installed to the side the position of the flue exit hole can be determined by car...

Страница 22: ...m diameter hole through the location hole in the end of the outer air duct 1 Ensure that the drill does not pierce the inner flue duct Secure the air ducts together using the screw 1 provided Place th...

Страница 23: ...w into the flue socket on the boiler and secure using the 30 mm air duct clamp 4 provided Pull the air flue duct back through the wall such that the flue duct fully engages into the flue elbow socket...

Страница 24: ...other fig 3 22 Pull the terminal off the flue duct Put the new terminal into the flue duct and click the lock Please note The catch on the top of the terminal must lock firmly into the notch in the f...

Страница 25: ...hind the terminal from the spacer Unlock the catch between the terminal and the flue duct by twisting them against each other fig 3 22 Pull the terminal off the flue duct Push the new terminal into th...

Страница 26: ...directly upwards Fig 4 1 Variable termination kit Assembly Before installing the flue pipe Use an 8 mm screwdriver to bend the catches inwards fig 4 3 Pull the terminal with the flue duct out of the a...

Страница 27: ...anger Before starting work shut down the appliance and prevent it from being switched on unintentionally Remove the wall seal from the terminal Use an 8 mm screwdriver to bend the catches inwards fig...

Страница 28: ...tion kit is installed are shown in the tables on pages 11 and 12 Please note The parts are simply pushed together not bolted Caution Fasten the 87 bend with bird protection grille using a separate pip...

Страница 29: ...29 PART 1 CONCENTRIC 60 100 Fig 4 11 Support clips with 45 bends INSTALLATION OF THE VARIABLE TERMINATION KIT Fig 4 10 Support clips with 87 bend 834449_05GB_022005 qxd 02 02 2005 17 12 Uhr Seite 29...

Страница 30: ...chants Change the bird protection grille from the 87 elbow to the extension installed at the end When using the 87 elbow put in the seal from the extension The extension installed at the end must be f...

Страница 31: ...ation and service clearances are available and that the boiler flue can be installed as detailed in these instructions Determine the point where the vertical air flue duct and terminal assembly will p...

Страница 32: ...een the air flue duct and the appliance Drill two holes 3 mm through the air duct of the flue boiler clamp at the most convienient holes on the air duct clamp Ensure that the drill does not penetrate...

Страница 33: ...installation of extensions and elbows Push the sliding sleeve 4 firmly into place on the extension Join the vertical roof duct 5 to the extension 7 Join the sliding sleeve 4 to the appliance s connec...

Страница 34: ...to mineral oil based grease products For this reason the seals must not be greased If the seals need wetting to aid in installation use water only De burr and file down any rough edges on the tubes be...

Страница 35: ...455 670 460 675 465 680 470 685 475 Table 6 1 Length of surplus with 87 elbows 190 to 210 mm 0 215 to not 265 mm possible 270 to 290 mm 80 295 85 300 90 305 95 310 100 315 105 320 110 325 115 330 120...

Страница 36: ...tant This gives a corresponding exhaust conduit length of 284 40 324 mm GU_LAZ 103 2GB Fig 6 4 Installation of 45 bends 325 320 445 330 327 450 335 334 455 340 341 460 345 348 465 350 355 470 355 362...

Страница 37: ...rds to be observed 38 Alternative termination accessories available 39 Maximum flue lengths for ecoMAX 42 Maximum flue lengths for ecoTEC 43 Changing the appliance connection piece 45 Installation of...

Страница 38: ...rved The installation of the boiler and its flue must be carried out by a competent person who is registered with CORGI The Council for Registered Gas Installers The installation of the boiler and flu...

Страница 39: ...sions PPs concentric 470 mm 80 125 303 202 x Air flue duct extensions PPs concentric 970 mm 80 125 303 203 x Air flue duct extensions PPs concentric 1970 mm 80 125 303 205 x Bends PPs concentric pack...

Страница 40: ...Accy No 303 210 Bends PPs 45 pack of 2 80 125 Vaillant Accy No 303 211 Air flue duct extension PPs 470 mm 80 125 Vaillant Accy No 303 202 Air flue duct extension PPs 970 mm 80 125 Vaillant Accy No 303...

Страница 41: ...k GU_LAZ 41 0 164 120 Fig 1 5 Sliding sleeve 80 125 Sliding sleeve PPs 80 125 Vaillant Accy No 303 215 GU_LAZ 76 0 153 130 390 Fig 1 8 Flat roof penetration collar GU_LAZ 42 0 Flat roof penetration co...

Страница 42: ...ength of flue is reduced by 2 5 m for each additional 90 elbow Maximum length of flue is reduced by 1 0 m for each additional 45 elbow Accessories Accy No Vertical flue systems 303 200 Max permitted c...

Страница 43: ...flue is reduced by 2 5 m for each additional 90 elbow Maximum length of flue is reduced by 1 0 m for each additional 45 elbow Accessories Accy No Vertical flue systems 303 200 Max permitted concentric...

Страница 44: ...44 PLANNING THE AIR FLUE DUCT LAYOUT Maximum flue length Maximum flue length LAS Euro B S 074 0 LAS Euro B S 074 0 Fig 1 10 Fig 1 9 834449_05GB_022005 qxd 02 02 2005 17 12 Uhr Seite 44...

Страница 45: ...ve it Push the appliance connection piece with the selected connection diameter down from above inserting the push in end onto the sleeve of the flue collecting chamber Now push the appliance connecti...

Страница 46: ...duct Pull back the sliding sleeve so that it engages into the socket 3 of the boiler 4 Ensure that the sliding sleeve penetrates the socket such that there is at least 20 mm engagement at both ends of...

Страница 47: ...t elements Fig 4 1 Horizontal air flue conduit GU_LAZ 82 0 Fig 4 2 Example of installation with horizontal air flue duct IMPORTANT The air flue duct is not concentric and the air duct has a slope of 1...

Страница 48: ...a rise towards outside of 3 Measure the distance from the outside face of the wall to the centre of the fan outlet on the boiler fig 4 5 This is dimension A For installations where the measured dista...

Страница 49: ...cts Note For assembly reasons do not shorten any air duct to a length of less than 100 mm If necessary shorten two adjacent extensions to achieve the overall required length Cut the air duct square an...

Страница 50: ...until it protrudes 220 mm out from the outside wall Ensure that the terminal is correctly positioned with the air inlet grille at the bottom Slide one of the two trim rings over the air duct until it...

Страница 51: ...firmly into place on the appropriate extensions 6 Install the extensions and join the clutch sleeve to the 87 elbow This section functions subsequently as a separation point Join all separation point...

Страница 52: ...for the boiler with reference to the installation and servicing instructions supplied with the boiler Ensure that all installation and service clearances are available and that the boiler flue can be...

Страница 53: ...duct 5 to the extension 7 Join the sliding sleeve 4 to the appliance s connection piece 8 This permits easy separation between the air flue duct and the appliance Drill two holes 3 mm through the air...

Страница 54: ...tails on the installation of extensions and elbows Push the sliding sleeve 4 firmly into place on the extension Join the vertical roof duct 5 to the extension 7 Join the sliding sleeve 4 to the applia...

Страница 55: ...ineral oil based grease products For this reason the seals must not be greased If the seals need wetting to aid in installation use water only De burr and file down any rough edges on the tubes before...

Страница 56: ...440 655 445 660 450 665 455 670 460 675 465 680 470 685 475 690 480 695 485 700 490 705 495 710 500 715 505 720 510 725 515 Table 6 1 Length of surplus with 90 elbows 200 205 0 210 0 210 to not 310 m...

Страница 57: ...20 mm Important This gives a corresponding exhaust conduit length of 284 40 324 mm GU_LAZ 103 2GB Fig 6 4 Installation of 45 bends 335 334 455 340 341 460 345 348 465 350 355 470 355 362 475 360 369 4...

Страница 58: ...Notes 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 58...

Страница 59: ...Notes 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 59...

Страница 60: ...834449_05 GB 02 2005 834449_05GB_022005 qxd 02 02 2005 17 13 Uhr Seite 60...

Отзывы: