13
Part Replacement Continued
Time Estimate: Approximately 20 minutes
Part: #186PGAUGE2
1. Follow pre-maintenance steps from page 10
2. Remove 8 Phillips screws from Front Control
Panel and pull panel out of machine (Fig. 14)
3. Remove pressure hose from rear of Pressure
Gauge by pulling it straight off the barb fitting
(Fig. 15 - A)
4. Remove two hex nuts from mounting bar
with a 8mm socket (Fig. 15 - B)
5. Pull Pressure Gauge from mounting bar and
out the front of the Control Panel
6. Installation is reverse of the removal steps
Pressure Gauge
Time Estimate: Approximately 20 minutes
Testing: Good = Red wire in ribbon has voltage
Bad = Red wire in ribbon no voltage
Visual Test: Check board for black or burn
marks, scratches or cracks
Part: #186P20F17
1. Follow pre-maintenance steps from page 10
2. Remove 8 Phillips screws from Front Control
Panel and pull panel out of machine (Fig. 14)
Continued on Page 14
Front Circuit Board
Fig. 14
Fig. 15
A
B
B
Fig. 16
Содержание 186VMC16F
Страница 22: ...22 Wire Diagram for VMC16F ...
Страница 23: ...23 Wire Diagram for VMC20F ...
Страница 24: ...24 Wire Diagram for VMC20FGF ...