
Electric Soladora CONVEY 260
www.utiform.com
departamento.té[email protected]
Tfno. + 34 96 570 29 82 fax: + 34 96 570 29 83
23
•
To stuff the deposit of mixing with material supplementary.
•
To control more water when necessary, and in such a case to add more.
•
Before closing the mixture deposit with their corresponding cover, to clean with a brush, or
something similar, the border of the boiler.
ATTENTION!
To fill the boiler with having only mixed 10 - 15 mm until the inferior
border of the mouth of having filled with the mixture boiler!
Otherwise he/she shortens the duration of life of the deposit considerably of mixing and their waste
pieces.
7.6
To transport
The pressure to generate inside the boiler is carried out pressing the lever (2) prepared in the boiler and
working the cover down. The process of transport begins with the auxiliary compressor in march and later on
opening the spherical key (1) of yellow colour prepared in the machine.
7
5
1
6
Never to open the cover if it is low pressure!
4
3
2
Nevertheless, this machine this endowed with a safe-deposit system so that the cover of the boiler
cannot open up with pressure. Before opening the cover of the boiler with the lever (2), it is necessary and
indispensable to work the lever (3) safe-deposit that works the opening of the escape valve (4) that this located
in the superior part of the boiler, escaping this way the whole existent pressure inside the boiler.
To clean the borders of the deposit. To change the rubber meeting immediately if this shows bigger
cracks or if he/she has entered material in the meeting.
Содержание Convey 260
Страница 42: ...Zerlegung ...