
Electric Soladora CONVEY 260
www.utiform.com
departamento.té[email protected]
Tfno. + 34 96 570 29 82 fax: + 34 96 570 29 83
21
7.2.2
Safe-deposit valve
The maintenance works and repair should be carried out by the supplier's authorized representative.
The tests that should be carried out are the following ones:
1. To control an or twice a year if the elevation mechanism opens up correctly. For it, it is necessary to rotate the
plug of the valve against the needles of the clock.
2. To control once a year the value regulator of pressure according to the local norms. This test should not be
carried out in the compressor but in an appropriate place for tests.
7.2.3
Prevention of accidents
1. All the pieces that rotate or they go of a side for other and that they are not protected otherwise and they can
represent a danger for the personnel, they are in the
CONVEY
in a box or they are fixedly screwed.
2. Never open low tension closets of electric distribution, connection cells and other electric equipment. If this is
unavoidable, for example for mensurations, tests or readjustments, these works should be carried out by a
specialized electrical technician and using appropriate tools and certain safety measures.
3. The noise, although it is not very high, it can put on nervous and upset, and after some time, our nervous
system can suffer strong damages.
Depending on the level of sound pressure in the places where the employees are, it is necessary to take the
following dispositions:
-
Lower to 70 dB (TO): any measures in particular.
-
Upper to 70 dB (TO): people that are continually in that area should use protection for the hearing.
-
Lower to 85 dB(A): for sporadic visitors that are for a while short in the area, it is not necessary to
take special protection measures.
-
Upper to 85 dB(A): Area of a lot of noise! In each entrance it should have a warning poster that
indicates that it is indispensable when entering in that area - although it is almost time - to take
protection for the hearing.
-
Upper to 95 dB (A): the warning posters in the entrances should point out that the visitor sporadic
debit side to take protection for the hearing.
-
Upper to 105 dB (A): they should be to disposition special protectors for the hearing that you/they
are adapted to the volume of the sound and the ghastly composition of the sound. In each entrance it
should have a poster of corresponding warning.
7.3
Control before the setting in march
•
To pay attention to that nobody is in the elevation area near the machines that have the load chute and
haulage shovel.
•
To pay attention to the appropriate electric outlet, that is to say, 32A for the CONVEY 260.
•
To keep in mind the correct position of all the cables. To assure all the lines of ascent of the hoses of
transport appropriately and to pay attention to the security of the joinings in the hoses that are appropriate and
don't be damaged.
•
The additional compressor is connected in a correct way with appropriate rubber pressure tubing.
Содержание Convey 260
Страница 42: ...Zerlegung ...