21
Initial Installation
QUALIFIED INSTALLERS ONLY
o
PtionaL
F
inishing
e
Dges
(
not
aPPLicabLe
FoR
u44i-a):
The U44 comes equipped with clean finishing
edges installed to allow for facing materials like
stone and tile. An optional 3-piece set of finishing
edges is also supplied with an integrated finishing
Figure 31: Finishing Edge Removal / Installation
1/2” flange
1/2” Drywall (Cabinet Adjusted forward)
2” stone (Cabinet adjusted back)
clean
edge
flange to accomodate rough edge facing materials
like cement board and drywall (if CSS has been
activated). To install the optional finishing edges:
1. Remove the safety screen
2. Use a T-20 Screwdriver to remove the existing
clean finishing flanges. There are 7 screws per
side and 6 across the top to remove.
3.
Install the supplied finishing flanges by re-
using the removed screws. The side flanges are
common and not left or right specific
Figure 32: Finishing Edge Comparison