The control can also be mounted on a standard
DIN rail.
(See fig. i)
First remove the control from its base and then, using the
hooks and spring clip on the back of the control (ordered
separately), mount it onto the DIN rail. This will be a
popular option for those who prefer to mount the control
inside a larger electrical panel.
The wiring can enter the bottom or the back of the
enclosure. Knock-outs provided in the base allow the
wiring to be run in conduit up to the enclosure. The base
also has holes that line up with the mounting holes of
most common electrical boxes.
17
INST
ALLA
TION
INSTALLATION - Step 2 - The Control Base
i
Содержание SYSTEMpro 311
Страница 1: ...SYSTEMpro 311 Installation Manual...
Страница 44: ...PROGRAMMING THE ADJUST MENU B DHW SETTINGS 42 PROGRAMMING PROGRAMMING Step 1 Programming the Control...
Страница 52: ...PROGRAMMING THE ADJUST MENU D SNOW MELTING SETTINGS 50 PROGRAMMING PROGRAMMING Step 1 Programming the Control...
Страница 56: ...PROGRAMMING THE ADJUST MENU E BOILER OPERATION 54 PROGRAMMING PROGRAMMING Step 1 Programming the Control...
Страница 90: ...88 APPENDIX II APPENDIX II SYSTEMpro 311 Menu Tree...
Страница 91: ...89 APPENDIX II APPENDIX II SYSTEMpro 311 Menu Tree...
Страница 92: ...90 APPENDIX III APPENDIX III Application Drawings...
Страница 93: ...91 APPENDIX III APPENDIX III Application Drawings...
Страница 94: ...92 APPENDIX III APPENDIX III Application Drawings...
Страница 95: ...93 APPENDIX III APPENDIX III Application Drawings...
Страница 96: ...94 APPENDIX III APPENDIX III Application Drawings...
Страница 97: ...95 APPENDIX III APPENDIX III Application Drawings...
Страница 98: ...96 APPENDIX III APPENDIX III Application Drawings...
Страница 99: ...97 APPENDIX III APPENDIX III Application Drawings...
Страница 106: ......