SECTION 4
SPECIFICATIONS
18
4
4.1
Standard Specifications for Pump Unit
Turbo molecular pump model
UTM2300A-MI-AVWX
UTM2300A-MI-AFWX
(Note 1)
UTM2300A-MI-BVWX
UTM2300A-MI-BFWX
Inlet flange
VG250 / ISO250F
Outlet flange
KF40
Cooling method
Water cooled
Mass
56 kg
Ultimate pressure (after baking)
10
-7
Pa order
Maximum allowable flow rate
Refer to Section 4.2
Maximum allowable inlet pressure
(N
2
continuous exhaust)
(Note 2)
4.5 Pa
Maximum allowable outlet pressure
(N
2
continuous exhaust)
(Note 2)
200 Pa
Pumping speed
(Note 4)
N
2
Ar
H
2
2100 L/s
2000 L/s
1200 L/s
Compression ratio
N
2
He
H
2
1×10
8
or more
5×10
3
9×10
2
Rated speed
33700 rpm
Start-up time
9 minutes or less
Mounting position
In any desired direction (Note 5)
Vibration level
(by ULVAC's method)
0.01 μm or less (0-peak)
Noise
60 dB(A) or less
R
ecommended flow rate of purge gas
(Note 3)
30 mL/min
Recommended pumping speed of
backing pump in case of gas purge
1500 L/min or more
Display
LED
POWER / STATUS / ROTATION / NET
Communication
Contact
REMOTE (D-sub 37 pin female, Screw lock size M2.6)
(cf.Section 6.7 "Remote-control Connector")
Input : START / STOP / RESET / LOW SPEED
Output : ROTATION / ACC. / BRAKE / NORMAL /
REMOTE / ALARM / WARNING / CONNECTION
Serial
RS-232C / RS-485
(D-sub 9 pin male, Screw lock size M2.6)
(cf.Section 6.8 "Communication Specifications")
Speed variation
Speed is variable between 25 % and 100 % of the rated speed.
(set as 0.1 %)
Alarm history
Remembers date, time, and description of last 99 alarm events.
Содержание UTM2300 Series
Страница 2: ...This page is intentionally left blank...
Страница 10: ...viii Location of Label...
Страница 20: ...6 1 1 2 Descriptions This page is intentionally left blank...
Страница 21: ...2 2IDENTIFICATION AND FUNCTION 2 1 Pump Main Unit 2 2 Control Panel 2 3 External I F Panel...
Страница 25: ...3 3CONSTRUCTION AND PRINCIPLE 3 1 Pump Construction 3 2 Principle of Turbo Molecular Pumping 3 3 Controller...
Страница 30: ...16 3 3 3 Controller This page is intentionally left blank...
Страница 36: ...22 4 4 3 Standards Fulfilled This page is intentionally left blank...
Страница 50: ...36 5 5 5 Notes on Transportation This page is intentionally left blank...
Страница 72: ...58 6 6 8 Communication Specifications This page is intentionally left blank...
Страница 73: ...7 7GAS PURGE...
Страница 82: ...68 8 8 6 Turbo Molecular Pump Return Request This page is intentionally left blank...
Страница 95: ...10 10WARRANTY CLAUSES...
Страница 98: ...84 10 This page is intentionally left blank...
Страница 100: ...Index Index 2 This page is intentionally left blank...