Table of Contents
ULVAC CRYOGENICS INCORPORATED
I
Table of Contents
Compressor unit Safety Instructions ·································································· S-1
Disposal Considerations ················································································· IW-1
Section 1.
C30VR
_
Compressor Description ····················································· 1-1
1.1 Introduction ······················································································ 1-1
1.2 Compressor
model
descriptions ··························································· 1-1
1.3 Terminology ····················································································· 1-2
1.4 Cryopump
system documents ······························································ 1-2
1.5
Roles of compressor in cryopump system ··············································· 1-2
1.6 Compressor
specifications ·································································· 1-3
1.7 Component
descriptions ····································································· 1-7
1.8 CRYO-U
®
cryopump multiple installation ·············································· 1-12
1.9
Compressor with inverter for refrigerator ··············································· 1-13
Section 2
Considerations before Installation ······················································ 2-1
2.1
Combination of cryopump and compressor ············································· 2-1
2.2 Installation
environment requirements ···················································· 2-1
2.3 Wiring
requirements ··········································································· 2-2
2.4 Cooling
water
requirements ································································· 2-4
2.5
Length of cables and flexible hoses ······················································· 2-7
2.6 Remote
functions ·············································································· 2-7
Section 3
Unpacking and Inspection ································································ 3-1
3.1 Compressor
carton ············································································ 3-1
3.2 Shipping
carton
inspection ·································································· 3-1
3.3 Unpacking
·······················································································
3-2
3.4 Carton
contents ················································································ 3-3
3.5
Inspection of the compressor and accessories ········································· 3-4
3.6
Flexible hoses and specifications ·························································· 3-4
Section 4
Equipment Installation, Piping, and Wiring ··········································· 4-1
4.1 Before
installation ·············································································· 4-1
4.2 Connecting
cooling
water piping ··························································· 4-2
4.3
Connecting and disconnecting helium flexible hoses ································· 4-2
4.4 Single
cryopump
installation ································································ 4-4
4.5 Multiple
cryopump installation ······························································ 4-5
4.6 Electrical
connections
········································································· 4-7
4.7
Wire rooting for compressor and other equipments ································· 4-13
Section 5
Operation ····················································································· 5-1
5.1
Verification of helium static pressure ······················································ 5-1
5.2 Compressor
operation ········································································ 5-2
5.3
Inspection after replacing helium circulation components ··························· 5-4
5.4
Precautions for when compressor is not in operation ································· 5-5
5.5
Maintenance operation for a compressor suspended for a long period ·········· 5-5
Содержание C30VR Series
Страница 2: ......
Страница 8: ...F 6 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 16: ...S 4 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 18: ...IW 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 32: ...C30VR Compressor Instruction Manual 1 14 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 108: ...CS 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...
Страница 110: ...Revision History R 2 ULVAC CRYOGENICS INCORPORATED This page intentionally left blank...