
9. Preventive and Scheduled
Maintenance to be performed by the
Operator
The maintenance operations described in this chapter need to be followed as
indicated to keep the device in good working condition and to keep any
breakdown time to a minimum.
The instructions that follow can easily be carried out by the operating personnel
and do not require a service technician.
Should the need arise, technical assistance or a service technician can be
requested by either calling your dealer or Tuttnauer U.S.A.
9.1 Daily Maintenance
Caution!
Make sure the autoclave is not hot before cleaning it.
l
Turn the unit on momentarily to allow the door to be opened. Open the
door, unplug the autoclave again, and proceed with cleaning.
l
Clean door gasket with a mild detergent, water and a soft cloth or sponge.
Check visually that the gasket is intact, not loose and clean.
9.2 Weekly Maintenance
Caution!
Make sure the autoclave is not hot before cleaning it.
l
Turn the unit on momentarily to allow the door to be opened. Open the
door, unplug the autoclave again, and proceed with cleaning.
l
Clean the outer parts of the autoclave with a soft cloth.
9.2.1
Chamber Clean
Once a week perform chamber clean process per section 12
Page 64
Содержание AMS11-120-T
Страница 2: ......
Страница 4: ...https www tuttnauerusa com...
Страница 16: ...1 10 Device Specifications 1 10 1 Overall Dimensions Page 9...
Страница 33: ...2 Select the Version information 3 The Version information is displayed For an example see below Page 26...
Страница 56: ...Note For the results of the cycle see description in section 8 5 Page 49...
Страница 67: ...Press to receive the entire printout of the selected cycle history Page 60...
Страница 86: ...Page 79...
Страница 105: ...Cat No MAN205 0502003EN Rev C COPYRIGHT...