3.7
Installation Tests
At the time of installation, before the autoclave can be okayed for
daily operation the service technician needs to perform the
following preliminary checks:
♦
Integrity check:
perform a visual check to verify that there are no
dents, scratches or broken components on the autoclave
♦
The leakage current check:
test the precise operation of the earth
leakage relay
♦
Ground check:
test the continuity of the grounding connection
♦
Power supply check:
check that proper power is being supplied to
the machine. See sec. 3.4.
♦
Pitch check:
confirm that the autoclave has a downward pitch back
to front of 1/8" per foot. (see sec. 3.5)
♦
Exhaust and Feed hose check:
ensure that all hoses are free
flowing and not restricted.
♦
Water Pressure Check:
verify that the city water pressure into the
unit is between 15 - 58 psi. Verify that the mineral free water
pressure into the unit is between 7 - 30 psi.
♦
Door check:
ensure that the door locking mechanism is
functioning properly
♦
Reset the Unit:
turn power off using the green power button at the
bottom of the front panel, press and hold the Sel. Cycle button on
the keypad, turn power on, continue to hold the Sel. Cycle button
until the message
Program Wait
appears on the screen.
♦
Atmospheric Pressure check:
the unit is set from the factory at
14.5 psia, this is atmospheric pressure at sea level. If the unit is
located more that 500 ft above or below sea level then the Atmos.
Press parameter must be set, see sec 8.2.17
♦
Safety Valve check:
test the safety valve as per the instructions in
sec 8.6 of the Operator's Manual
♦
Cycle check:
run a B&D Test to ensure that all systems in the unit
are functioning properly.
After the above steps are performed, the autoclave is ready for
daily operation
Содержание 2540 EHS
Страница 10: ...9 REAR VIEW...
Страница 17: ...16 Layout diagram of the ANL T2 is provided below ANL T2 BOARD Top View Bottom View...
Страница 19: ...18 AC T1 BOARD Top View Bottom View...
Страница 30: ...29 6 4 Input Output Graph...
Страница 31: ...30...
Страница 32: ...31...
Страница 33: ...32...
Страница 34: ...33...
Страница 35: ...34...
Страница 66: ...65...
Страница 68: ...67...
Страница 120: ...119 VESSEL ASSEMBLY Model 2540 EHS Model 3870 EHS...
Страница 121: ...120 OUTER CABINET ASSEMBLY Model 2540 EHS Model 3870 EHS...
Страница 122: ...121 TRAY HOLDER For model 2540 TRH254 0009 For model 3870 TRH387 0001...
Страница 123: ...122 TRAY TRAY HANDLE CMT240 0001 MODEL SIZE CAT No 2540 TRY240 0001 Big TRY387 0001 3870 Small TRY387 0003...
Страница 126: ...125 PIPING DRAWING FOR 2540 EHS...
Страница 127: ...126 PIPING DRAWING FOR 3870 EHS...
Страница 128: ...127 ELECTRICAL DRAWING FOR 2540 EHS...
Страница 129: ...128 ELECTRICAL DRAWING FOR 3870 EHS TILL S N 2307039...
Страница 130: ...129 ELECTRICAL DRAWING FOR 3870 EHS AFTER S N 2307040...