Commissioning
Installation Inspection
In order to ensure the unit is installed correctly, the following points should be checked:
Ensure the power supply corresponds to the correct connection values and suitable fuses have
been used.
Has the mechanical and electrical installation been performed correctly and completely?
Check the mechanical and electrical installation for completeness and the correct input voltages.
Ensure that the optical components are free from dust and dirt.
Have the protective covers been removed from the focusing objective lens?
Check the environmental conditions against the technical specification.
Are you familiar with the laser safety regulations?
Have all laser safety measured been fulfilled? The system may then only be switched on once all provi-
sions for complying with laser safety have been checked by an authorised individual and confirmed to
have met the standards.
Marking Software
The marking software is already installed on the supplied PC.. It is also included in the setup on the accompanying
software CD.
For information on using the software, please read the accompanying software handbook.