9.  Let the drill do the work. Do not apply excessive pressure. Lift the drill up and down 

occasionally to remove residue to reduce binding. 

10. Drill the hole to depth equal to the length of anchor. You can drill completely through the 

floor so that when you remove the lift at a later date you can hammer them down instead 
of just cutting off with a saw. 

11. For better holding power blow dust from the hole. 
12. Place a flat washer and hex nut over threaded end of anchor, leaving approximately ½ 

inch of thread exposed. Carefully tap anchor. Do not damage threads. Tap anchor into 
the concrete until nut and flat washer are against base plate

. Do not use an impact 

wrench to tighten.

 Tighten the nut, two or three turns on average concrete (28 day 

minimum cure). If the concrete is very hard only one or two turns may be needed. Check 
each anchor bolt with torque wrench set to 120 foot pounds. 

13. Recheck Anchors periodically to be sure they have not loosened and retighten as 

needed. 

INSTALLATION 

Check for ceiling clearance first to confirm the lift can be set up in your shop bay. You will 
need at least 144” of ceiling height. 

CAUTION: DO NOT install on asphalt or other similar unstable surface. Concrete only. 
Columns are supported only by anchors in the floor. 

1.  After unloading the lift, place it near the intended installation location. Remove the 

shipping bands and packing materials. Remove the parts from inside that columns. 

2.  Unbolt columns from packing brackets. You will need a fork lift to remove the columns 

due to their weight. Do not discard bolts as they are used in the assembly of the lift.  

3.  Make sure your choice of installation leaves enough distance from all walls and 

obstacles. The ceiling height must be at least 12 feet. It is recommended locate the 
power side 

column on the vehicle driver’s side for ease of operation later. 

4.  Raise the offside column (not power unit column) to vertical position. 

  

 

5. 

Position the columns facing each other at 103.5” inside base plates. Square the columns 
by measuring diagonally from corner points on base plates (wit

hin ¼”). Or by dropping a 

chalk line to help you keep both base plates on the same plane. (Columns must be 
parallel to each other). 

Содержание NTO-10A

Страница 1: ...Page 1 of 20 DATE INSTALLED ____________ SERIAL NUMBER _____________ OVERHEADTWOPOSTLIFT NTO 9A NTO 10A NTO 9AE FOR MODELS...

Страница 2: ...damage incurred due to non compliance this these safety instructions are not covered by warranty LIFT SPECIFICATIONS 9 000 Pound NTO 9AE NTO09A 10 000 Pound NTO 10A Max Capacity Two Post Overhead Ver...

Страница 3: ...Page 3 of 20...

Страница 4: ...ch Tall Ladder Fork Lift or other method of raising columns and toprails Electrical connectors to connect 220 volt power unit use Qualified Electrician Level Chalk Line Good O ring Pliers Grease for c...

Страница 5: ...ization to change delivery address All products must be delivered to a physical address Please note that we do not own or operate the delivery trucks they are all common carriers Customer can arrange...

Страница 6: ...using the standard anchor bolts if the top of the embedded anchor exceeds 2 25 above floor grade you DO NOT have enough embedment 2 Use the holes in base plates as guide for drilling the holes needed...

Страница 7: ...ON Check for ceiling clearance first to confirm the lift can be set up in your shop bay You will need at least 144 of ceiling height CAUTION DO NOT install on asphalt or other similar unstable surface...

Страница 8: ...mb If needed use horseshoe shims provided by placing shims under the base plates and around the anchor bolts This will prevent bending the column bottom plates Shim thickness should not exceed Tighten...

Страница 9: ...of the base to the bottom of the carriage DOUBLE CHECK THE LATCHES ARE ENGAGED BEFORE WORKING UNDER OR AROUND THE CARRIAGES This dimension should be within b Run the first cable Tighten nut on one cab...

Страница 10: ...le to approximately side to side play Check the latch releases to insure the carriage is still engaged in the appropriate latch 15 Check cylinders are in place properly They were installed in factory...

Страница 11: ...nd fill the reservoir Use a light weight non foaming non detergent hydraulic oil The unit will hold 12 quarts Fill to within two inches of top Measure with screw driver or finger 21 Have a qualified e...

Страница 12: ...ith cut off bar Adjust as needed 25 Do not place any vehicle on the lift at this time Cycle the lift up and down several times to insure latches engage properly and all air is removed from the system...

Страница 13: ...tighten jam nuts to clamp the cable into place in the lock lever With the cable attached at the lever end and 1 Route cable up the column over the release pulleys and back down to the second lock rele...

Страница 14: ...t mandatory to keep hydraulic fluid clean No hard fast rules can be established operating temperature type of service contamination levels filtration and chemical composition of fluid should be consid...

Страница 15: ...ton on power unit to begin raising the lift It may take about 40 to 50 seconds if raising to full height Remember there are many other stopping points in between should you not want to raise to full h...

Страница 16: ...e vehicles within the lifting capacity of the lift Observe the rated load capacity and load distribution of the lift 2 In principle the lift is designed for both approach directions For long service l...

Страница 17: ...Make sure the locking gears engage when lifting a load for safety 5 SAFETY TIPS FOR SERVICING LIFT a Maintenance or repair work by trained service personnel only b Turn off the electricity to lift be...

Страница 18: ...rvoir overfilled Reduce the oil to the oil level Motor hums and does not run Impeller fan cover is dented Take off and straighten Faulty wiring Call electrician Bad capacitor Call electrician Low volt...

Страница 19: ...banking institution honor payment Purchaser Customer further agrees to not initiate a credit card charge back and or cancel check payment by phone at any time once automotive equipment has shipped Pu...

Страница 20: ...f Texas County of Tarrant Our supplier will not enter into any verbal agreements regarding changes to the stated warranty policy We reserve the right to change or amend any measurements instructions p...

Отзывы: