11. After fastening the cross beam, check and confirm that the remaining column is plumb. 

 

 

 

(Making sure the power column on left and offside column are plumb. Critical.) 

12. Secure the power column, and make plumb. In same fashion as the first column. 
13. At this point you can put in all anchors in both columns once you are sure they are 

positioned properly and plumb and square. Also make sure you have securely bolted the 
top rail. Install the rubber door protectors on both columns with bolts provided. 
 

 

14. Install the equalizing cables. 

a.  Manually set both carriages on the first safety latch. Be sure each carriage is at 

the same height by measuring from the top of the base to the bottom of the 
carriage. DOUBLE CHECK THE LATCHES ARE ENGAGED BEFORE 
WORKING UNDER OR AROUND THE CARRIAGES). This dimension should be 
within ¼”. 

b.  Run the first cable. Tighten nut on one cable stud. Pull the other end of the cable 

and run nut on it. Tighten both nuts. Repeat above for second cable. 

 

Note: the cable stud that connects to the front right corner of the carriage should be 
connected first by pulling the stud through the carriage hold and up where it is easy 
to be held by locking pliers. Pull the stud past the locknut. Connect the other ends to 
the rear right corners of the carriage with at least ½” of thread showing past the lock 
nut (cables run on the inside of the carriage). It may be necessary to manually raise 
both carriages above the cylinder to prodi enough space to use the locking pliers. 
Make sure the carriage is set in the LOCK position. 

Содержание NTO-10A

Страница 1: ...Page 1 of 20 DATE INSTALLED ____________ SERIAL NUMBER _____________ OVERHEADTWOPOSTLIFT NTO 9A NTO 10A NTO 9AE FOR MODELS...

Страница 2: ...damage incurred due to non compliance this these safety instructions are not covered by warranty LIFT SPECIFICATIONS 9 000 Pound NTO 9AE NTO09A 10 000 Pound NTO 10A Max Capacity Two Post Overhead Ver...

Страница 3: ...Page 3 of 20...

Страница 4: ...ch Tall Ladder Fork Lift or other method of raising columns and toprails Electrical connectors to connect 220 volt power unit use Qualified Electrician Level Chalk Line Good O ring Pliers Grease for c...

Страница 5: ...ization to change delivery address All products must be delivered to a physical address Please note that we do not own or operate the delivery trucks they are all common carriers Customer can arrange...

Страница 6: ...using the standard anchor bolts if the top of the embedded anchor exceeds 2 25 above floor grade you DO NOT have enough embedment 2 Use the holes in base plates as guide for drilling the holes needed...

Страница 7: ...ON Check for ceiling clearance first to confirm the lift can be set up in your shop bay You will need at least 144 of ceiling height CAUTION DO NOT install on asphalt or other similar unstable surface...

Страница 8: ...mb If needed use horseshoe shims provided by placing shims under the base plates and around the anchor bolts This will prevent bending the column bottom plates Shim thickness should not exceed Tighten...

Страница 9: ...of the base to the bottom of the carriage DOUBLE CHECK THE LATCHES ARE ENGAGED BEFORE WORKING UNDER OR AROUND THE CARRIAGES This dimension should be within b Run the first cable Tighten nut on one cab...

Страница 10: ...le to approximately side to side play Check the latch releases to insure the carriage is still engaged in the appropriate latch 15 Check cylinders are in place properly They were installed in factory...

Страница 11: ...nd fill the reservoir Use a light weight non foaming non detergent hydraulic oil The unit will hold 12 quarts Fill to within two inches of top Measure with screw driver or finger 21 Have a qualified e...

Страница 12: ...ith cut off bar Adjust as needed 25 Do not place any vehicle on the lift at this time Cycle the lift up and down several times to insure latches engage properly and all air is removed from the system...

Страница 13: ...tighten jam nuts to clamp the cable into place in the lock lever With the cable attached at the lever end and 1 Route cable up the column over the release pulleys and back down to the second lock rele...

Страница 14: ...t mandatory to keep hydraulic fluid clean No hard fast rules can be established operating temperature type of service contamination levels filtration and chemical composition of fluid should be consid...

Страница 15: ...ton on power unit to begin raising the lift It may take about 40 to 50 seconds if raising to full height Remember there are many other stopping points in between should you not want to raise to full h...

Страница 16: ...e vehicles within the lifting capacity of the lift Observe the rated load capacity and load distribution of the lift 2 In principle the lift is designed for both approach directions For long service l...

Страница 17: ...Make sure the locking gears engage when lifting a load for safety 5 SAFETY TIPS FOR SERVICING LIFT a Maintenance or repair work by trained service personnel only b Turn off the electricity to lift be...

Страница 18: ...rvoir overfilled Reduce the oil to the oil level Motor hums and does not run Impeller fan cover is dented Take off and straighten Faulty wiring Call electrician Bad capacitor Call electrician Low volt...

Страница 19: ...banking institution honor payment Purchaser Customer further agrees to not initiate a credit card charge back and or cancel check payment by phone at any time once automotive equipment has shipped Pu...

Страница 20: ...f Texas County of Tarrant Our supplier will not enter into any verbal agreements regarding changes to the stated warranty policy We reserve the right to change or amend any measurements instructions p...

Отзывы: