Page 11 of 20
18. Install all swing arms, make sure that gear rack are engaging the moon gear on the arms
properly. There are two triple and a two double stage arms. The triple arms should be
toward the front of the car as you are sitting in it, two stage arms will hold up the
rear of the vehicle.
19. Truck Adapters
– When using lift you can use the three sizes of drop in adapters.
Especially useful on trucks.
(Shown with no adapter, 1.5”, 3”, and 6”)
20. Remove the vent plug from the power unit and fill the reservoir. Use a light weight non
foaming, non-detergent hydraulic oil. The unit will hold 12 quarts. Fill to within two inches
of top. Measure with screw driver or finger.
21. Have a qualified electrician hook up the power unit to the power supply. The electrical
wiring must comply with local code. Protect circuit with time delay fuse or circuit breaker.
22. Installation of Overhead Cut-Off Beam
a. The cut off beam is installed on the top rail and protects against over raising the
lift. There is an electric cut off switch. Remove the wires and thread through the
small tubes on the inside of the power beam. Start from bottom and when you
get to the top reattached to the switch.
Содержание NTO-10A
Страница 3: ...Page 3 of 20...