TrinityHighway.com
22
Revision E November 2020
3) Lifting/Placing the System
Mark the centerline on the front and rear of the Base Track. Use the Lifting Eyes located on
the Middle Rail of the Rear Base Track (look down into the Cylinders) to lift the REACT 350
®
II
into place (Figure 15).
Use fixed-length slings with a 6,000 lb. [2722 kg] minimum capacity. Fixed slings will prevent
the REACT 350
®
II from tipping. Do not lift overhead. Measure from the centerline to ensure
that the REACT 350
®
II is centered and positioned at the proper angle. The steel Base Track
will rest flush against the roadside obstacle face for assemblies that do not require transitions.
Figure 15 - Lifting Eye Location(s)
Warning:
Ensure the hoist device is properly rated to lift the REACT 350
®
II
system.
For Self-Contained Backup assemblies requiring transition hardware to concrete wall or
safety shape barrier (PN 616120), the steel Base Track should be 5” [127 mm] forward of the
roadside obstacle face (Figure 16).
Figure 16 – Transition Hardware
Lifting Eyes
5" [127 mm]
Barrier
Transition Hardware - PN 616120
Required to Help Prevent
Snagging of Impacting Vehicle
Concrete Pad
Base Track
Содержание REACT 350 II
Страница 1: ......
Страница 38: ...TrinityHighway com 37 Revision E November 2020 REACT 350 II TL 3 w Self Contained Backup R626B036U...
Страница 39: ...TrinityHighway com 38 Revision E November 2020 REACT 350 II TL 3 w Concrete Backup R626C036U...
Страница 40: ...TrinityHighway com 39 Revision E November 2020 Transition Assembly SC BU UNI 117815...
Страница 41: ...TrinityHighway com 40 Revision E November 2020 Transition Assembly SC BU N 616120...
Страница 42: ...TrinityHighway com 41 Revision E November 2020 Transition Assembly SC BU N w Rub Rail 117827...
Страница 43: ...TrinityHighway com 42 Revision E November 2020...
Страница 44: ...TrinityHighway com 43 Revision E November 2020...
Страница 45: ...TrinityHighway com 44 Revision E November 2020 Base Track Assembly 36 Wide Units 605028...
Страница 46: ...TrinityHighway com 45 Revision E November 2020...
Страница 47: ...TrinityHighway com 46 Revision E November 2020 Concrete B up Base Track Assembly 36 Wide Units 605020...
Страница 48: ...TrinityHighway com 47 Revision E November 2020...
Страница 49: ...TrinityHighway com 48 Revision E November 2020...
Страница 50: ...TrinityHighway com 49 Revision E November 2020 Transition Assembly w Concrete Backup 616084...
Страница 51: ...TrinityHighway com 50 Revision E November 2020 Cast in Place Concrete Slab w Steel Backup 36 114054...
Страница 52: ...TrinityHighway com 51 Revision E November 2020...
Страница 53: ...TrinityHighway com 52 Revision E November 2020...
Страница 54: ...TrinityHighway com 53 Revision E November 2020 Nose Cover Assembly TL 3 617967...
Страница 55: ...TrinityHighway com 54 Revision E November 2020 Chain CYL Connector Assembly 606182...
Страница 56: ...TrinityHighway com 55 Revision E November 2020...
Страница 57: ...TrinityHighway com 56 Revision E November 2020 Cable Assemblies 605780...
Страница 58: ...TrinityHighway com 57 Revision E November 2020...
Страница 59: ...TrinityHighway com 58 Revision E November 2020 Reflector Assembly White Amber Side 613705...
Страница 60: ...TrinityHighway com 59 Revision E November 2020 Misc Hardware 611324...
Страница 61: ...TrinityHighway com 60 Revision E November 2020 Debris Cover Assembly 36 606715...
Страница 62: ...TrinityHighway com 61 Revision E November 2020 Debris Cover Assembly 36 606716...
Страница 63: ...TrinityHighway com 62 Revision E November 2020 Debris Cover Assembly 618102...
Страница 64: ...TrinityHighway com 63 Revision E November 2020 Drivable Pile Anchor DPA 607938...
Страница 65: ...TrinityHighway com 64 Revision E November 2020 Sign Post Assembly 115254...
Страница 66: ...TrinityHighway com 65 Revision E November 2020 NOTES...
Страница 67: ...TrinityHighway com 66 Revision E November 2020 NOTES...
Страница 68: ......