TrinityHighway.com
15
Revision E November 2020
System Design
Self-Contained Backup
The REACT 350
®
II with a Self-Contained Backup is intended to minimize assembly time. This
type of system arrives at the site fully assembled. The assembly crew needs only to lift and place
the system in front of the barrier then drill and set the anchors. Refer to the Assembly section on
page 21 for a complete list of instructions
.
Roadside Feature Width
Generally the REACT 350
®
II, with a Self-Contained Backup, can shield objects up to 8” [203 mm]
wide in a gore application. This type of system can also shield wider roadside features in non-
gore and bidirectional traffic locations (p. 17). Please contact Trinity Highway for any additional
information (p. 3).
When shielding median barriers (32” [813 mm] high safety shape or single slope), a Self-
Contained Backup may be used if the base or “toe” of the barrier is tapered @ 1:4 (15 deg.
Maximum) starting at the projected face of the Self-Contained Backup (Figure 6).
Transition
panels must be added to any side exposed to traffic (p. 22, Figure 16). This helps prevent
interaction of wheels on impacting vehicles.
Figure 6
Tapered Barrier
1:4 Taper @ Base
of Concrete Barrier
1:4 Taper @ Base
of Concrete Barrier
Projected face of
Self-Contained
Backup
Содержание REACT 350 II
Страница 1: ......
Страница 38: ...TrinityHighway com 37 Revision E November 2020 REACT 350 II TL 3 w Self Contained Backup R626B036U...
Страница 39: ...TrinityHighway com 38 Revision E November 2020 REACT 350 II TL 3 w Concrete Backup R626C036U...
Страница 40: ...TrinityHighway com 39 Revision E November 2020 Transition Assembly SC BU UNI 117815...
Страница 41: ...TrinityHighway com 40 Revision E November 2020 Transition Assembly SC BU N 616120...
Страница 42: ...TrinityHighway com 41 Revision E November 2020 Transition Assembly SC BU N w Rub Rail 117827...
Страница 43: ...TrinityHighway com 42 Revision E November 2020...
Страница 44: ...TrinityHighway com 43 Revision E November 2020...
Страница 45: ...TrinityHighway com 44 Revision E November 2020 Base Track Assembly 36 Wide Units 605028...
Страница 46: ...TrinityHighway com 45 Revision E November 2020...
Страница 47: ...TrinityHighway com 46 Revision E November 2020 Concrete B up Base Track Assembly 36 Wide Units 605020...
Страница 48: ...TrinityHighway com 47 Revision E November 2020...
Страница 49: ...TrinityHighway com 48 Revision E November 2020...
Страница 50: ...TrinityHighway com 49 Revision E November 2020 Transition Assembly w Concrete Backup 616084...
Страница 51: ...TrinityHighway com 50 Revision E November 2020 Cast in Place Concrete Slab w Steel Backup 36 114054...
Страница 52: ...TrinityHighway com 51 Revision E November 2020...
Страница 53: ...TrinityHighway com 52 Revision E November 2020...
Страница 54: ...TrinityHighway com 53 Revision E November 2020 Nose Cover Assembly TL 3 617967...
Страница 55: ...TrinityHighway com 54 Revision E November 2020 Chain CYL Connector Assembly 606182...
Страница 56: ...TrinityHighway com 55 Revision E November 2020...
Страница 57: ...TrinityHighway com 56 Revision E November 2020 Cable Assemblies 605780...
Страница 58: ...TrinityHighway com 57 Revision E November 2020...
Страница 59: ...TrinityHighway com 58 Revision E November 2020 Reflector Assembly White Amber Side 613705...
Страница 60: ...TrinityHighway com 59 Revision E November 2020 Misc Hardware 611324...
Страница 61: ...TrinityHighway com 60 Revision E November 2020 Debris Cover Assembly 36 606715...
Страница 62: ...TrinityHighway com 61 Revision E November 2020 Debris Cover Assembly 36 606716...
Страница 63: ...TrinityHighway com 62 Revision E November 2020 Debris Cover Assembly 618102...
Страница 64: ...TrinityHighway com 63 Revision E November 2020 Drivable Pile Anchor DPA 607938...
Страница 65: ...TrinityHighway com 64 Revision E November 2020 Sign Post Assembly 115254...
Страница 66: ...TrinityHighway com 65 Revision E November 2020 NOTES...
Страница 67: ...TrinityHighway com 66 Revision E November 2020 NOTES...
Страница 68: ......