TrinityHighway.com
February 2022
STEP 13
MATT™ Delineation Assembly
PARTS
INSTRUCTIONS
A
628342B
1 EA
Reference: SS-6288
1. For median/roadside application, attach the Delineation Sheeting (Part YY)
to the MATT™ Impact Head (Part A) as shown above. Rotate as
appropriate.
2. For gore application, attach the Delineation Sheeting (Part ZZ) to the
MATT™ Impact Head (Part A).
Note:
Manufacturer suggests that user provide delineation (reflective sheeting)
as required by the state/specifying agency for terminals.
Note:
Trinity Highway offers two (2) specific reflective sheeting options for an
additional charge.
Trinity Highway makes no guarantees they meet the
minimum specifications, comply with MUTCD requirements or comply with
state/specifying agency requirements.
YY
105379B
1 EA
OR
ZZ
105380B
1 EA
Use only Trinity Highway parts that
are specified herein for the
MATT™
for
assembling,
maintaining, or repairing the
MATT™. Do not utilize or
otherwise commingle parts from
other systems even if those
systems are Trinity Highway
systems.
WARNINGS
Ensure delineation (reflective sheeting) used on the MATT™ Impact
Head meets state/specifying agency’s MUTCD for proper
delineation.
Ensure steel delineator posts are a minimum of 3’-0” [1 m] in front
(upstream) of the MATT™.
Failure to follow these warnings could result in serious injury or death
in the event of a vehicle impact with the system.
Median
Gore
Roadside
Note: The Delineation
Sheeting must be notched in
four (4) places for the gusset
plates.
NOTCH DETAIL TYPICAL AT
4 GUSSET PLATES
Содержание MATT
Страница 41: ...TrinityHighway com February 2022 NOTES...
Страница 42: ...TrinityHighway com February 2022 NOTES...
Страница 43: ...TrinityHighway com February 2022 NOTES...
Страница 44: ......