background image

 

 
 

 

TrinityHighway.com

 

February 2022 

 

Site Preparation 

The MATT™ has a system

 

length of 34’-4 1/2” [10.477 m], long and is a tangent, 31” [787mm]

 

(+1” -0”) [+25 mm, -0 mm] 

high,  double-sided,  re-directive/gating  and  energy  absorbing  attenuator/end  terminal  available  for  use  with  various 
longitudinal highway barriers, in either unidirectional or bidirectional traffic applications.  
It may be specified for use by the state/specifying agency in conjunction with strong post W-beam guardrail systems on 
the  NHS  or  other  roadway.    The  decision  to  specify  the  MATT™  for  a  particular  project  is  the  responsibility  of  the 
state/specifying agency design engineer who must ensure that the most appropriate end treatment has been selected 
for the specific site conditions. 

The MATT™ is designed to be attached directly to double sided strong post W-beam guardrail systems that have been 
accepted under MASH or NCHRP Report 350 crash test criteria that utilize 8” [200 mm] offset blocks. 

 

IMPORTANT:      The  MATT™  must  not  be  attached  directly  to  a  weak      post  W-beam 
guardrail  system  without  an  approved  weak-post-to-strong-post  transition  plus  a 
minimum of 12’-6” [3.810 m] strong post W-beam guardrail with 6’-3” [1.905 m] post 
spacing. The 12’-6” [3.810 m] strong post W-beam guardrail must be placed between 
the MATT™ and the weak-post- to-strong-post transition. 
 
IMPORTANT:  Under  NO  circumstances  shall  the  rail  within  the  MATT™  be  curved, 
between Post 1 and Post 6.  Ensure all MATT™ post spacings are 6’-3” [1.905 m] on 
center. 

 

IMPORTANT: When used with rigid barriers, (i.e. concrete barrier, wall or bridge pier) a 
semi to rigid barrier transition will be required (see state/specifying agency standards).   
 

 

IMPORTANT: 

Ensure  the 

state/specifying  agency  standard  transition  is  used  when 

connecting the MATT™ to a system other than double sided, 31” [787 mm] high MGS with 8” 
[200 mm] offset blocks. 

 

IMPORTANT: Ensure that the MATT™

 

application conforms to the AASHTO Roadside 

Design Guide, current edition to include appropriate grading details. 
 

 

IMPORTANT:  Trinity  Highway  does  not  direct  grading.    Proper  site  grading  must  be 
accomplished before assembly of the MATT™ in accordance with local guidelines OR 
the  AASHTO  Roadside  Design  Guide  (see  Appendix  A  and  B),  whichever  is  more 
stringent. Failure to follow this warning could result in serious injury or death in the 
event of a vehicle impact with the system. 
 
IMPORTANT: The Beginning Length of Need (“BLON”) for the MATT™

 

was established 

during MASH Test 3-35 at Post 3, which is 12’-6” [3.810 m] from Post 1. 
 
 
IMPORTANT:  Only 8” [200 mm] composite offset blocks can be used at Post 6 and only 
the supplied special MATT™ spacers/double spacers at all other post locations.

  

 
 

MATT was tested to MASH-2nd Edition (2016), with 2020 Errata Test Level 3 criteria and 
may be used in Test Level 1, Test Level 2, and Test Level 3 applications – when installed 
at the full Test Level 3 system length of 34’ 4-1/2” [10.477 m]. 

 

Содержание MATT

Страница 1: ...PN 628155 Created February 2022 MATT Median Attenuating TREND Terminal Assembly Manual TRINITY HIGHWAY Ahead of the Curve...

Страница 2: ...These instructions are for standard assembly specified by the appropriate highway agency In the event the specified system assembly maintenance or repair would require a deviation from standard assemb...

Страница 3: ...gent double sided re directive gating and energy absorbing attenuator end terminal for use with various longitudinal highway barriers in either unidirectional or bidirectional traffic applications to...

Страница 4: ...sembly Posts 3 to 5 24 STEP 6 MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 2 858 m 25 STEP 7 MATT 12 Gauge Slotted Intermediate Guardrail With Fin 3 6 3 1 905 m Posts 4 5 26 STEP 8 MATT 12 Ga...

Страница 5: ...onal Highway System OSHA Occupational Safety Health Administration PPE Personal Protective Equipment SYTP Steel Yielding Terminal Post TL 3 Test Level 3 Trinity Highway Trinity Highway Products LLC Cu...

Страница 6: ...oval proper installation and maintenance of any highway product is the sole responsibility of the state specifying agency WARNING Under NO circumstances shall the rail within the MATT be curved radius...

Страница 7: ...ead MATT CR top and bottom posts MATT SYTP with soil plate MATT system line post with soil plate MATT angle strut MATT cable assembly MATT spacers composite offset blocks and various other required ha...

Страница 8: ...aint and Pen Straight Edge Level Plumb Line Post Pounder commonly used for driving posts Auger Soil Tamper 5 8 Alignment Tool Drift Pin used to help align panels Locking Pliers and or Pipe Wrench Cali...

Страница 9: ...ircumstances shall the rail within the MATT be curved between Post 1 and Post 6 Ensure all MATT post spacings are 6 3 1 905 m on center IMPORTANT When used with rigid barriers i e concrete barrier wal...

Страница 10: ...ided around the posts and filled with the state specifying agency approved backfill material If solid rock is encountered at post locations 3 6 refer to the state specifying agency guidelines and or t...

Страница 11: ...0G 16 V 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 3403G 6 W 5 8 x 2 GR Bolt Grade 5 A325 16 mm x 51 mm 118614G 62 Y 5 16 Hex Nut 8 mm 3245G 2 Z 5 8 Heavy Hex Nut A563 16 mm 3361G 66 AA 5 8 Round Washer 16 m...

Страница 12: ...lowing components hardware are not shown to scale ID A PN 628342B ID B PN 628289A ID C PN 628337A MATT Impact Head MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 MATT 12 Gauge Slotted Intermedi...

Страница 13: ...king Plate MATT CR Post 1 Top MATT CR Post 1 Bottom ID M PN 628271G ID N PN 628270G ID O PN 628279G MATT SYTP 6 0 MATT Line Post 6 0 MATT Angle Strut ID P PN 119506G ID Q PN 33909G ID R PN 628348G MAT...

Страница 14: ...ID V PN 3403G ID W PN 118614G ID Y PN 3245G 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 5 8 x 2 GR Bolt Grade 5 16 mm x 51 mm 5 16 Hex Nut 8 mm ID Z PN 3361G ID AA PN 4372G ID BB PN 3340G 5 8 Heavy Hex Nut A5...

Страница 15: ...8273G 5 16 Flat Washer 8 mm 8 200 mm Composite Offset Block MATT Soil Plate Posts 1 2 ID NN PN 628269G ID OO PN 113660G ID TT PN 3500G MATT Soil Plate W Shaped Posts 3 6 5 8 x 3 50 Hex Bolt Grade 5 A3...

Страница 16: ...is fully assembled for Steps 5A and 5B tighten the double single spacers to a snug position with a minimum of two 2 bolt threads protruding beyond the nut for all hardware that was assembled loosely...

Страница 17: ...ht of the MATT CR Post 1 Bottom is 4 100 mm 1 0 25mm 0 mm above finished grade Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do...

Страница 18: ...MATT CR Post 1 Bottom With Soil Plate is 4 100 mm 1 0 25 mm 0 mm above finished grade T 3391G 2 EA BB 3340G 2 EA MM 628273G 1 EA Use only Trinity Highway parts that are specified herein for the MATT...

Страница 19: ...e approximately at finished grade 1 0 25 mm 0 mm BB 3340G 2 EA MM 628273G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repai...

Страница 20: ...he SYTP Holes are approximately at finished grade 1 0 25 mm 0 mm BB 3340G 6 EA NN 628269G 3 EA OO 113660G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling main...

Страница 21: ...Post 6 at location established in Step 1 BB 3340G 2 EA NN 628269G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the...

Страница 22: ...g maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Trinity Highway systems WARNINGS Ensure the flat washer is between the bolt...

Страница 23: ...rinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Tr...

Страница 24: ...only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems...

Страница 25: ...A AA 4372G 6 EA BB 3340G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from ot...

Страница 26: ...2 EA TT 3500G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems...

Страница 27: ...ed grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not uti...

Страница 28: ...EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise co...

Страница 29: ...G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle part...

Страница 30: ...1 0 25 mm 0 mm above finished grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or re...

Страница 31: ...and hooked over the MATT CR Post 1 Top Q 33909G 1 EA CC 4902G 2 EA DD 3910G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT...

Страница 32: ...p W 118614G 8 EA Z 3361G 8 EA CC 4902G 8 EA EE 118615G 8 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or oth...

Страница 33: ...ications comply with MUTCD requirements or comply with state specifying agency requirements YY 105379B 1 EA OR ZZ 105380B 1 EA Use only Trinity Highway parts that are specified herein for the MATT for...

Страница 34: ...EA Z 3361G 2 EA EE 118615G 2 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise...

Страница 35: ...d the MATT 10 Gauge Head Rails back evenly Z 3361G 4 EA EE 118615G 4 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairi...

Страница 36: ...ered taut when it does not deflect more than 1 25 mm when pressure is applied by hand in an up or down direction Use only Trinity Highway parts that are specified herein for the MATT for assembling ma...

Страница 37: ...l Plate using the upstream hole in the post p 24 12 Ensure all MATT Guardrails are installed 31 787 mm 1 0 25 mm 0 mm from finished grade pp various 13 Ensure all MATT 12 Gauge Transition Guardrails W...

Страница 38: ...m components Check for vandalism Check for damage caused by adverse weather conditions i e erosion weight of snow UV Check that the anchor cable appears taut Walk Up Inspections Recommended Frequency...

Страница 39: ...g Detail Detail derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished befo...

Страница 40: ...derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished before assembly of t...

Страница 41: ...TrinityHighway com February 2022 NOTES...

Страница 42: ...TrinityHighway com February 2022 NOTES...

Страница 43: ...TrinityHighway com February 2022 NOTES...

Страница 44: ......

Отзывы: