TrinityHighway.com
February 2022
Assembly Steps
To ensure an accurate assembly of the MATT™ Terminal, it is recommended that steps be
completed in order. ALL STEPS MUST BE COMPLETED.
Below ground portions in some assembly steps are not shown for clarity.
See Step 16 for bolt/nuts combinations that must be torqued to 65 ft-lb [88 Nm]
(+/-
3 ft-lb)
[+/- 4 Nm].
After the system is fully assembled, for Steps 5A and 5B, tighten the double/single
spacers to a snug position with a minimum of two (2) bolt threads protruding beyond the
nut for all hardware that was assembled loosely, ensuring bolt is seated for these steps.
MATT™ 10 Gauge, Slotted Front Guardrail WithOUT Fin-1, 6’-3” [1.905 m] PN 628347G
MATT™ 12 Gauge, Slotted Intermediate Guardrail WithOUT Fin-2, 6’-3” [1.905 m] PN 628274G
MATT™ 12 Gauge, Slotted Intermediate Guardrail WITH Fin-3, 6’-3” [1.905 m] PN 628337A
MATT™ 12 Gauge, Transition Guardrail WITH Fin-4, 9’-4 1/2” [2.858 m] PN 628289A
B
C
D
E
Содержание MATT
Страница 41: ...TrinityHighway com February 2022 NOTES...
Страница 42: ...TrinityHighway com February 2022 NOTES...
Страница 43: ...TrinityHighway com February 2022 NOTES...
Страница 44: ......