TrinityHighway.com
February 2022
STEP 2A
MATT™ CR Post 1 Bottom With Soil Plate
Assembly
PARTS
INSTRUCTIONS
L
628276A 1 EA
Reference: SS-6288
1. Assemble the MATT™ Soil Plate (Part MM) to the
downstream
side of the
6’-0” [1.829 m] MATT™ CR Post 1 Bottom (Part L) as shown above using
specified hardware (Parts T, BB).
2. Tighten all threaded hardware to a snug position with a minimum of two (2)
bolt threads protruding beyond the nut.
3. Assemble the 6’-0” [1.829 m] MATT™ CR Post 1 Bottom With Soil Plate as
shown above at location established in Step 1.
4. Ensure that the MATT™ Strut Hole is assembled on the
upstream
side of
the post.
5. Ensure the top of the MATT™ CR Post 1 Bottom With Soil Plate is 4” [100
mm] (+1”, -0”) [+25 mm, -0 mm] above finished grade.
T
3391G
2 EA
BB
3340G
2 EA
MM
628273G
1 EA
Use only Trinity Highway parts that
are specified herein for the MATT™
for assembling, maintaining, or
repairing the MATT™. Do not
utilize or otherwise commingle
parts from other systems even if
those systems are Trinity Highway
systems.
WARNINGS
Ensure the MATT™ Soil Plate is on the
downstream
side of the
CR Post 1 Bottom and Strut Hole is
upstream
.
Ensure threaded hardware is tightened to a snug position with a
minimum of two (2) bolt threads protruding beyond the nut.
Ensure the top of the MATT™ CR Post 1 Bottom With Soil Plate is
4” [100 mm] (+1”, -0”) [+25 mm, -0 mm] above finished grade.
Failure to follow these warnings could result in serious injury or
death in the event of a vehicle impact with the system.
POST 1
Содержание MATT
Страница 41: ...TrinityHighway com February 2022 NOTES...
Страница 42: ...TrinityHighway com February 2022 NOTES...
Страница 43: ...TrinityHighway com February 2022 NOTES...
Страница 44: ......