background image

 

 
 

 

TrinityHighway.com

 

February 2022 

 

 

ID 

MATT™

 

COMPONENTS/HARDWARE                              (506288B) 

PN 

QUANITY 

MATT™ Impact Head 

628342B 

MATT™ 12 Gauge Transition Guardrail With Fin-4, 9’-4 1/2” [2.858 m] 

628289A 

MATT™ 12 Gauge, Slotted Intermediate Guardrail With Fin-3, 6’-3” [1.905 m]  628337A 

MATT™ 12 Gauge, Slotted Intermediate Guardrail-2, 6’-3” [1.905 m] 

628274G 

MATT™ 10 Gauge, Slotted Front Guardrail-1, 6’-3”[1.905 m] 

628347G 

MATT™ 10 Gauge Head Rail, 1’- 9 3/4” [552 mm] 

628339A 

MATT™ Single Spacer 

628281A 

MATT™ Double Spacer 

628280A 

MATT™ Head Tube 

628275A 

MATT™ Backing Plate 

628338G 

MATT™ CR Post 1 Top 

628285A 

MATT™ CR Post 1 Bottom – used with soil plate 

628276A 

MATT™ SYTP

®

 6’-0” [1.829 m] – used with soil plate 

628271G 

MATT™ System Line Post 6’-0” [1.829 m] – used with soil plate 

628270G 

MATT™ Angle Strut 

628279G 

MATT™ Cable Assembly 3/4” x 7’-5” [19 mm x 2.260 m] 

119506G 

Cable Anchor Bracket Angle 

33909G 

MATT™ Strut Adapter Plate 

628348G 

5/16” x 1.75” Hex Bolt                                                            [8 mm x 44 mm] 

4211G 

5/8” x 1.75” Hex Bolt Grade 5 (A325)                                  [16 mm x 44 mm]     

3391G 

5/8” x 1.25” GR Bolt                                                             [16 mm x 31 mm] 

3360G 

16 

5/8” x 2” Hex Bolt A307                                                        [16 mm x 51 mm] 

3403G 

W* 

5/8” x 2” GR Bolt Grade 5 (A325)                                        [16 mm x 51 mm] 

118614G 

62 

5/16” Hex Nut                                                                                       [8 mm] 

3245G 

Z* 

5/8” Heavy Hex Nut A563                                                                   [16 mm] 

3361G 

66 

AA    5/8” Round Washer                                                                             [16 mm] 

4372G 

BB 

5/8” GR Hex Nut                                                                                 [16 mm] 

3340G 

36 

CC  1” Flat Washer                                                                                    [25 mm] 

4902G 

10 

DD  1” Hex Nut                                                                                          [25 mm] 

3910G 

EE 

5/8” Flat Washer (1/4” Thick)                                         [16 mm] [6 mm thick] 

118615G 

62 

FF 

1/2” x 1.5” Hex Bolt                                                              [13 mm x 38 mm] 

113457G 

GG  1/2” Flat Washer                                                                                 [13 mm] 

118009G 

HH  1/2” Hex Nut                                                                                        [13 mm] 

115939G 

JJ 

5/16” Flat Washer 

 

3240G 

KK 

8” [200 mm] Composite Offset Block (wood is not allowed) 

Various 

MM  MATT™ Soil PL, 1/4” x 18” x 24” [6 mm x 457 mm x 610 mm] for Posts 1-2 

628273G 

NN  MATT™ Soil Plate W-Shaped (Multi-Directional) for Posts 3-6 

628269G 

OO  5/8” x 3.50” Hex Bolt Grade 5 (A325)                                  [16 mm x 90 mm] 

113660G 

10 

TT 

5/8” x 10” GR Bolt A307                                                     [16 mm x 254 mm] 

3500G 

 

 

 

 

 

 

 

 

 

Optional Delineation Available From Trinity Highway 

 

 

YY 

25” x 25” [625 mm x 625 mm] Yellow/Black Reflector (Median/Roadside) 

105379B 

ZZ 

25” x 25” [625 mm x 625 mm] Yellow/Black Reflector (Gore) 

105380B 

 

 

 

 
 
 
 

Gauge Conversions 

10 Gauge [3.43 mm] 
12 Gauge [2.67 mm] 

 
 

*   Fastener combinations at 62 locations of “W”, 5/8” x 2” GR Bolt Grade 5 (A325) and 

“Z”, 5/8” Heavy Hex Nut A563 DH require the Nuts to be torqued to 65 ft-lb [88 
Newton-Meters “Nm”], (+/- 3 ft-lb) [+/- 4 Nm].  See Step 16 for the 62 locations.

 

 

 

Содержание MATT

Страница 1: ...PN 628155 Created February 2022 MATT Median Attenuating TREND Terminal Assembly Manual TRINITY HIGHWAY Ahead of the Curve...

Страница 2: ...These instructions are for standard assembly specified by the appropriate highway agency In the event the specified system assembly maintenance or repair would require a deviation from standard assemb...

Страница 3: ...gent double sided re directive gating and energy absorbing attenuator end terminal for use with various longitudinal highway barriers in either unidirectional or bidirectional traffic applications to...

Страница 4: ...sembly Posts 3 to 5 24 STEP 6 MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 2 858 m 25 STEP 7 MATT 12 Gauge Slotted Intermediate Guardrail With Fin 3 6 3 1 905 m Posts 4 5 26 STEP 8 MATT 12 Ga...

Страница 5: ...onal Highway System OSHA Occupational Safety Health Administration PPE Personal Protective Equipment SYTP Steel Yielding Terminal Post TL 3 Test Level 3 Trinity Highway Trinity Highway Products LLC Cu...

Страница 6: ...oval proper installation and maintenance of any highway product is the sole responsibility of the state specifying agency WARNING Under NO circumstances shall the rail within the MATT be curved radius...

Страница 7: ...ead MATT CR top and bottom posts MATT SYTP with soil plate MATT system line post with soil plate MATT angle strut MATT cable assembly MATT spacers composite offset blocks and various other required ha...

Страница 8: ...aint and Pen Straight Edge Level Plumb Line Post Pounder commonly used for driving posts Auger Soil Tamper 5 8 Alignment Tool Drift Pin used to help align panels Locking Pliers and or Pipe Wrench Cali...

Страница 9: ...ircumstances shall the rail within the MATT be curved between Post 1 and Post 6 Ensure all MATT post spacings are 6 3 1 905 m on center IMPORTANT When used with rigid barriers i e concrete barrier wal...

Страница 10: ...ided around the posts and filled with the state specifying agency approved backfill material If solid rock is encountered at post locations 3 6 refer to the state specifying agency guidelines and or t...

Страница 11: ...0G 16 V 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 3403G 6 W 5 8 x 2 GR Bolt Grade 5 A325 16 mm x 51 mm 118614G 62 Y 5 16 Hex Nut 8 mm 3245G 2 Z 5 8 Heavy Hex Nut A563 16 mm 3361G 66 AA 5 8 Round Washer 16 m...

Страница 12: ...lowing components hardware are not shown to scale ID A PN 628342B ID B PN 628289A ID C PN 628337A MATT Impact Head MATT 12 Gauge Transition Guardrail With Fin 4 9 4 1 2 MATT 12 Gauge Slotted Intermedi...

Страница 13: ...king Plate MATT CR Post 1 Top MATT CR Post 1 Bottom ID M PN 628271G ID N PN 628270G ID O PN 628279G MATT SYTP 6 0 MATT Line Post 6 0 MATT Angle Strut ID P PN 119506G ID Q PN 33909G ID R PN 628348G MAT...

Страница 14: ...ID V PN 3403G ID W PN 118614G ID Y PN 3245G 5 8 x 2 Hex Bolt A307 16 mm x 51 mm 5 8 x 2 GR Bolt Grade 5 16 mm x 51 mm 5 16 Hex Nut 8 mm ID Z PN 3361G ID AA PN 4372G ID BB PN 3340G 5 8 Heavy Hex Nut A5...

Страница 15: ...8273G 5 16 Flat Washer 8 mm 8 200 mm Composite Offset Block MATT Soil Plate Posts 1 2 ID NN PN 628269G ID OO PN 113660G ID TT PN 3500G MATT Soil Plate W Shaped Posts 3 6 5 8 x 3 50 Hex Bolt Grade 5 A3...

Страница 16: ...is fully assembled for Steps 5A and 5B tighten the double single spacers to a snug position with a minimum of two 2 bolt threads protruding beyond the nut for all hardware that was assembled loosely...

Страница 17: ...ht of the MATT CR Post 1 Bottom is 4 100 mm 1 0 25mm 0 mm above finished grade Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do...

Страница 18: ...MATT CR Post 1 Bottom With Soil Plate is 4 100 mm 1 0 25 mm 0 mm above finished grade T 3391G 2 EA BB 3340G 2 EA MM 628273G 1 EA Use only Trinity Highway parts that are specified herein for the MATT...

Страница 19: ...e approximately at finished grade 1 0 25 mm 0 mm BB 3340G 2 EA MM 628273G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repai...

Страница 20: ...he SYTP Holes are approximately at finished grade 1 0 25 mm 0 mm BB 3340G 6 EA NN 628269G 3 EA OO 113660G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling main...

Страница 21: ...Post 6 at location established in Step 1 BB 3340G 2 EA NN 628269G 1 EA OO 113660G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the...

Страница 22: ...g maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Trinity Highway systems WARNINGS Ensure the flat washer is between the bolt...

Страница 23: ...rinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems are Tr...

Страница 24: ...only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems even if those systems...

Страница 25: ...A AA 4372G 6 EA BB 3340G 6 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from ot...

Страница 26: ...2 EA TT 3500G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle parts from other systems...

Страница 27: ...ed grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not uti...

Страница 28: ...EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise co...

Страница 29: ...G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise commingle part...

Страница 30: ...1 0 25 mm 0 mm above finished grade J 628338G 2 EA W 118614G 12 EA Z 3361G 12 EA EE 118615G 12 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or re...

Страница 31: ...and hooked over the MATT CR Post 1 Top Q 33909G 1 EA CC 4902G 2 EA DD 3910G 2 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT...

Страница 32: ...p W 118614G 8 EA Z 3361G 8 EA CC 4902G 8 EA EE 118615G 8 EA Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or oth...

Страница 33: ...ications comply with MUTCD requirements or comply with state specifying agency requirements YY 105379B 1 EA OR ZZ 105380B 1 EA Use only Trinity Highway parts that are specified herein for the MATT for...

Страница 34: ...EA Z 3361G 2 EA EE 118615G 2 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairing the MATT Do not utilize or otherwise...

Страница 35: ...d the MATT 10 Gauge Head Rails back evenly Z 3361G 4 EA EE 118615G 4 EA 628342B from Step 13 Use only Trinity Highway parts that are specified herein for the MATT for assembling maintaining or repairi...

Страница 36: ...ered taut when it does not deflect more than 1 25 mm when pressure is applied by hand in an up or down direction Use only Trinity Highway parts that are specified herein for the MATT for assembling ma...

Страница 37: ...l Plate using the upstream hole in the post p 24 12 Ensure all MATT Guardrails are installed 31 787 mm 1 0 25 mm 0 mm from finished grade pp various 13 Ensure all MATT 12 Gauge Transition Guardrails W...

Страница 38: ...m components Check for vandalism Check for damage caused by adverse weather conditions i e erosion weight of snow UV Check that the anchor cable appears taut Walk Up Inspections Recommended Frequency...

Страница 39: ...g Detail Detail derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished befo...

Страница 40: ...derived from information contained in the AASHTO Roadside Design Guide 4 th Edition 2011 IMPORTANT Trinity Highway does not direct grading Proper site grading must be accomplished before assembly of t...

Страница 41: ...TrinityHighway com February 2022 NOTES...

Страница 42: ...TrinityHighway com February 2022 NOTES...

Страница 43: ...TrinityHighway com February 2022 NOTES...

Страница 44: ......

Отзывы: