![Travis Industries Xtreme 6020 Скачать руководство пользователя страница 39](http://html.mh-extra.com/html/travis-industries/xtreme-6020/xtreme-6020_installation-manual_1154149039.webp)
Installation
(for qualified installers only)
39
© Travis Industries
4140717
100-01351
Facing Example – Flush Drywall
Drywall may be installed on top of the fiber board (NOTE:do not install drywall or other combustible over
the 2” (51mm) strip above the tile stop. It is also installed below the tile stop. Because the fiber board is
½” (12mm) thick, we recommend using two layers of drywall below the fireplace to make the facing flush.
See the illustration below for further details.
NOTE
: If using 5/8” (15mm) drywall, use the included spacer to position the fiber board flush with the
drywall (see item “I” in the illustration below).
NOTE
: You may wish to setback the framing ½ (12mm) or 5/8” (15mm) to allow the drywall to overlap the
fiberboard. See “Framing Setback” page 40 for details.
(a) Framing to side of fireplace.
(b) Fiber board above tile stop.
(c) Drywall above tile stop.
(d) 2” (51mm) Strip of fiber board above tile stop.
(e) Fiber board to the side of tile stop.
(f) Tile
stop.
(g) Drywall to the side of tile stop.
(h) Two layers of ½” (12mm) drywall are used below the tile stop to make the facing flush.
(i) 5/8” (15mm) Drywall spacer (used to postion the fiber board flush with the drywall).
c
d
b
e
g
f
1/2" (12mm) Drywall
a
b
c
d
e
g
f
h
c
d
i
b
e
g
f
5/8" (15mm) Drywall