Phase 1 Software Loading
SwitchMaster™ Bridge phase 1 operation loads configuration software. The
default is loading configuration software from the SwitchMaster™
EEPROM.
Optionally, during phase 1 operation, configuration software can be
loaded from a network server using the bootp function. During power on,
at some point in the reset, the top row of Status LEDs flashes continuously
while the bottom row of Status LEDs are steadily illuminated, indicating
that the SwitchMaster™ Bridge software can be interrupted by an optional
user input. During this period, at the attached terminal, press the space bar
to load the configuration software from the attached terminal or other
network server.
Phase 2 Normal Operation
SwitchMaster™ Bridge phase 2 operation is the normal operating mode.
During phase 2 operation, configuration software can be displayed and/or
modified at an attached ASCII terminal.
4-4
SwitchMaster™/SwitchMasterFL™
Ethernet Port 2 Test
Ethernet Port 3 Test
Ethernet Port 4 Test
Ethernet Port 5 Test
Ethernet Port 6 Test
Ethernet Port 7 Test
Ethernet Port 8 Test