40
RT-SVX25C-EN
Start Up
Note:
The scroll compressor for R22 units uses Trane OIL-42 without substitution. The appropriate
oil charge for a 9 and 10 ton compressor is 8 pints. For a 14 and 15 ton scroll compressor
use 14 pints.
Note:
The Copeland, SSA and SPA scroll compressors for R410A units use Trane OIL00094. The
correct Oil for Trane CSHD is Trane OIL00079 or OIL00080. Compressor types are listed in
the following table. The appropriate oil charge is also listed below.
2. After the compressor and condenser fan have started and operated for approximately 30
minutes, observe the operating pressures. Compare the operating pressures to the operating
pressure curve in the Service Facts.
3. Check system superheat. Follow the instruction listed on the superheat charging curve in the
Service Facts. Superheat should be within ±5° F of the superheat chart value.
4. Repeat steps 1 through 4 for each refrigerant circuit.
5. To stop the SERVICE TEST, turn the main power disconnect switch to the “Off” position or
proceed to the next component start-up procedure. Remove electro mechanical test mode
connections (if applicable).
Figure 20. Compressor terminal box
Table 7.
Compressor types
Tonnage C1
C2
150
SSA067
SSA067
180
CSHD105
SPA057
210
CSHD142
SPA054
240
CSHD142
SSA083
300
CSHD120
CSHD120
Table 8.
POE Oil recharge amount (fl. oz.)
Model
C1
C2
150
56
56
180
112
52
210
112
62
240
112
56
300
112
106
Содержание TC*150-301
Страница 13: ...RT SVX25C EN 13 Unit Dimensions Figure 1 WITHOUT ECONOMIZER 5 8 WITH ECONOMIZER 5 0 ...
Страница 30: ...30 RT SVX25C EN Installation Figure 17 5 HVAC units 10 HVAC units ...
Страница 31: ...RT SVX25C EN 31 Installation Figure 18 Typical field wiring diagrams for optional controls ReliaTel only ...
Страница 61: ......
Страница 62: ......