![Trane SCWM Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/trane/scwm/scwm_installation-operation-and-maintenance-manual_1150283023.webp)
PKG-SVX027C-EN
23
Installation - Mechanical
Unit Handling
W
WA
AR
RN
NIIN
NG
G
IIm
mp
prro
op
pe
err U
Un
niitt L
Liifftt!!
F
Fa
aiillu
urre
e tto
o p
prro
op
pe
errlly
y lliifftt u
un
niitt iin
n a
a L
LE
EV
VE
EL
L p
po
ossiittiio
on
n
cco
ou
ulld
d rre
essu
ulltt iin
n u
un
niitt d
drro
op
pp
piin
ng
g a
an
nd
d p
po
ossssiib
blly
y
ccrru
ussh
hiin
ng
g o
op
pe
erra
atto
orr//tte
ecch
hn
niicciia
an
n w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y,, a
an
nd
d e
eq
qu
uiip
pm
me
en
ntt o
orr
p
prro
op
pe
errtty
y--o
on
nlly
y d
da
am
ma
ag
ge
e..
T
Te
esstt lliifftt u
un
niitt a
ap
pp
prro
ox
xiim
ma
atte
elly
y 2
24
4 iin
ncch
he
ess ((6
61
1 ccm
m)) tto
o
v
ve
erriiffy
y p
prro
op
pe
err cce
en
ntte
err o
off g
grra
av
viitty
y lliifftt p
po
oiin
ntt.. T
To
o a
av
vo
oiid
d
d
drro
op
pp
piin
ng
g o
off u
un
niitt,, rre
ep
po
ossiittiio
on
n lliiffttiin
ng
g p
po
oiin
ntt iiff u
un
niitt iiss
n
no
ott lle
ev
ve
ell..
•
Unit can be moved into space using 4-wheel
Dollies, Hand Truck, or Pallet Jack.
•
Be careful not to damage cassette bottom panel
during movement.
•
The unit was designed so that all components can
be moved through a standard commercial width
doorway and make a turn in a standard commercial
width hallway. Certain circumstances may still
require the Evaporator Cassette to be disassembled
to move it into the mechanical room. For
disassembly instructions, please contact MJC Sales
at (770) 988 8338.
Installation Preparation
Before installing the unit, perform the following
procedures to ensure proper unit operation, refer
.
1. Position the evaporator module and skid assembly
in its final location.
2. Remove the skids from under the unit. See
. If you find internal damage, file a claim
immediately to the delivering carrier.
3. Remove the protective shipping covers from the
cassettes.
4. Set the evaporator into place before proceeding.
Place the evaporator on the isolator pads (see next
section) if the unit has the isolator option.
Unit Vibration Isolator Option
(Isopads)
IIm
mp
po
orrtta
an
ntt:: Vibration isolation is not necessary for the
unit since the factory internally isolates the
compressors, thus creating double
isolation. Trane strongly recommends that
you consult a vibration specialist when
considering double isolation. In general,
Trane does not recommend double-
isolation.
1. Cut appropriate sized “waffles” from the sheets
provided. In general, a 2x2 pattern works well under
each cassette.
2. Place the pads at each intersection of the
Condensing Unit Cassettes.
3. Align the remaining pads along the back side (filter
side) of the Evaporator Cassette.
Figure 10.
Isolator pads locations
N
No
otte
ess::
•
The unit is equipped with a positively sloped
drain pan to help indoor air quality (IAQ)
and does not require one corner of the unit
to be pitched.
•
Unit is not internally trapped. Installer must
externally trap the condensate line.