![Trane AFDR Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/trane/afdr/afdr_installation-instructions-manual_1149514037.webp)
Installation
AFDR-SVN001D-EN
37
Panel Preparation—Close Mount (Kit 2 — 4 conduit)
Refer to
during the following procedure.
2. Drill four 2.5-inch diameter holes at Locations 1–4, as
. These holes will be used to route
the power wire which connects the unit to the AFD.
Notes:
•
Test-fit the 2.5-inch conduit fittings at the locations to
ensure the conduit and or fitting will not interfere with
the unit evaporator and or panel before drilling holes.
•
Depending on the unit’s evaporator size the holes may
be located further inward than specified without
interference between conduit and evaporator.
Locating the holes further inward will aid in harness
installation later. Before drilling, make sure conduit
and fittings will not interfere with evaporator or panel
door.
Note:
See
for conduit location
dimensions.
Figure 37.
Power conduit hole locations
2-4X Holes Drilled
Panel Front
Panel Bottom
2-4X Ø 2.5
3
1
4
2