Installation
36
AFDR-SVN001D-EN
Panel Preparation—Close Mount (Kit 1 — 2 conduit)
If using a remote mount or wall mount option with field-
provided power wire and conduit, skip to
Component Installation (All Kits),” p. 38
.
Refer to
during the following procedure.
1. Drill two 2.5-inch diameter holes at Location 2 and
Location 4, as shown in
. These holes will be
used to route the power wire which connects the unit
to the AFD.
Notes:
•
Test-fit the 2.5-inch conduit fittings at the locations to
ensure the conduit and or fitting will not interfere with
the unit evaporator and or panel before drilling holes.
•
Depending on the unit’s evaporator size the holes may
be located further inward than specified without
interference between conduit and evaporator.
Locating the holes further inward will aid in harness
installation later. Before drilling, make sure conduit
and fittings will not interfere with evaporator or panel
door.
Note:
See
for conduit location
dimensions.
Figure 36.
Conduit hole locations
2X Holes Drilled
Panel Front
Panel Bottom
2X Ø 2.5
2
1