4.2 TMS (TOYOTA MONITORING SYSTEM)
107
4) Checking the network wiring routes
•
Be sure that the planned network devices can be connected without any problem.
•
Be sure that there is no obstacle in the route to make wiring impossible.
•
Be sure that the network cable length does not exceed 100 m in any place. Since actual wiring
requires leading-in from under the floor into the loom and switching hub box, provide a sufficient
margin in length calculation.
•
If any obstacle exists in the planned route, change the wiring route.
•
If the network cable length exceeds 100 m, add a relaying switching hub (a small one having
about 8 ports) for extension within the route.