background image

ZK1800 

SWING GATE OPERATOR USER’S MANUAL 

22 

11. Electrical / Setting                                                                                                                         

 

Learn / erase remote controls 

Adding extra remote controls (Learn):   

 

Press  the 

‘LEARN’ button on the control board  (see  Fig.24  No.7),  then the  green indicator 

‘LED2’ (see Fig.24 No.6) will be on. 

 

Press the remote control button which you want to use, the 

‘LED2’ will turn off. 

 

Press the same button again, the ‘LED2’  will flash about 5 seconds at 2Hz  frequency. The 

learning process is finished. 

 

Up to 25 remote controls may be used. 

 

To erase all remote controls 

 

Press and hold the ‘LEARN’ button on the control board until ‘LED2’ turns on and then turns 

off. This indicates that all the remote controls have been erased completely.   

 

The remote control works in a single channel mode. With each press of the remote control 

button which has been programmed, the gate will close, stop, open or stop cycle. 

Warning: Notify the users that the gate is never to be operated unless it is in full view. 

For safety and security, we recommend that the factory setting be replaced with a personal 

code. 

 

Auto-stop function 

 

Slowly  rotating  the 

sensitivity  sensor  ‘FORCE  ADJ’  (see  Fig.24  No.1  and  No.2)  with  a 

screwdriver,  1#  sensor  can  be  used  to  adjust  primary  operator,  2#  sensor  can  be  used  to 

adjust secondary operator. 

 

Rotating  the  sensor  clockwise  increases  the  force.  Rotating  the  sensor  anticlockwise 

decrease the force. 

 

Place an immobile object along the gate path, allowing the gate to strike it while in the open 

or close cycle. The gate will stop if obstructed when closing or opening.   

 

If it does not, increase or decrease the force and repeat this test. Repeat the steps until the 

correct force has been set. 

 

Operators  must  be  individually  adjusted,  repeat  the  steps  as  above  for  the  secondary 

operator using the 2# sensor. 

 

Auto-close function

 

 

Place the jumper cap on both pins of terminal 

‘SW’ see Fig.24, No.9, the gates will stay open 

for 30

±

3 seconds before automatically closing. 

 

Remove the jumper cap or place the jumper ca

p on one pin of terminal ‘SW’, the auto-close 

function is shut off. 

An Infrared device is required to be installed for safety if the auto-close feature is enabled. 

Factory preset: the auto-close function is shut off. 

 

 

 

Содержание ZK1800

Страница 1: ...CHNICIANS SHOULD ATTEMPT INSTALLATION OR SERVICE TO THIS UNIT OTHERWISE SERIOUS PERSONAL INJURY DEATH OR PROPERTY DAMAGE MAY OCCUR PLEASE KEEP THESE INSTRUCTIONS FOR FURTHER REFERENCE Total Door Autom...

Страница 2: ...tional Features 3 3 Specifications 4 4 Necessary Tools 4 5 Site Preparation 4 6 Packing List 5 7 Mechanical Installation 6 8 Mechanical Adjustment 14 9 Electrical Control Box Mounting 15 10 Electrical...

Страница 3: ...control away from children The automatic gate operator must be grounded Be careful when in close proximity to moving parts where hands or fingers could be pinched Do not allow control devices to be pl...

Страница 4: ...d the operator must operate on a reinforced point on the gate and that its dimensions and weights conform to those listed in the specifications of this document The gate should be mounted to the fence...

Страница 5: ...0 Swing Gate Operator Item Diagram Quantity Remark For one gate leaf For two gate leafs Operator 1 2 Post bracket 1 2 Gate bracket 1 2 Control box 2 remotes 1 1 Stop block 1 2 Optional Electric Lock 1...

Страница 6: ...will be a push to open or a pull to open installation In either configuration the gate is mounted on one face of the mounting post and the operator is mounted on the face 90 degrees from it Below are...

Страница 7: ...R 65 S 635 635 Post bracket S Gate bracket Base plate close position Stop block open position 5 10mm 0 E Fig 2 Push to open mounting geometry Main structure and dimension see Fig 3 and Fig 4 Operator...

Страница 8: ...g Add a cross bar on the gate if necessary Note If the operator is mounted at a height above the specified range and the gate is not sturdy enough then it may result in bending or damage to the gate a...

Страница 9: ...sary in order to obtain the correct mounting geometry Fix the post bracket on the cement pillar with screws and spacers or welding for metal pillar Make sure that the bracket is plumb and lever See Fi...

Страница 10: ...e gate bracket make sure E 85mm Mark a vertical line around 635mm from the center of hinge Fig 9 If the gate brackets shipped do not fit your gate because of the dimensions of your gate you may have t...

Страница 11: ...screw socket should not reach the mechanical stop If this is not the case review bracket positioning and that its dimensions conform to those listed in the specifications of this document After you ha...

Страница 12: ...electric lock is provided for installation for gate lengths greater than 1 5 meters To install the base plate of the lock place the base plate between the two gates determine the location mark and dr...

Страница 13: ...d on the gate section with the lock so that when it closes it will trap the gate section without the lock between itself and the base plate thus locking both gate sections Top plate With the gate in t...

Страница 14: ...he close limit switch by a screwdriver Move the close limit switch into the required position and tighten the limit switch lock screw see Fig 18 Manually open the gate to fully open position Slacken a...

Страница 15: ...conduit must be set into the concrete when it is poured To prevent rainwater from entering into the cable arrange the cable as shown in Fig 20 A Wires within the cable shall be located or protected so...

Страница 16: ...we regard the gate with the electrical lock as the primary gate the other gate as the secondary gate 223 138 Fig 21 Control box mounting size 10 Electrical Main Terminal Wiring Note following is wiri...

Страница 17: ...e Green Control board E U1 V1 W1 CL1 COM OP1 Secondary operator E U V W CL COM OP Colour Yellow Green Blue white Brown red Black Red White Green Control board E U2 V2 W2 CL2 COM OP2 1 2 3 2 3 Main uni...

Страница 18: ...00 SWING GATE OPERATOR USER S MANUAL 18 Fig 24 Control board diagram Ground E N L U1 V1W1U2 V2W2 LAMP LOCKOP1 Com CL1OP2 Com CL2 Com IR 12V O S C Com K T G 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 18 16...

Страница 19: ...External button switch keypad interface Connect external button switch keypad 11 Infrared photocell Normally open 12V 12 Limit switch Normally open 13 Electric lock DC12V 14 Flashing light AC240V 15...

Страница 20: ...to U1 V1 W1 connect limit switch to OP1 COM CL1 it is important to short the OP2 and COM CL2 and COM terminal with the jumper wires See Fig 27 Fig 27 COM OP1 LOCK X5 CL1 OP2 COM CL2 Electric lock ope...

Страница 21: ...X6 Connection of infrared photocells 12V Signal Photocell receiver Photocell transmitter 12V COM COM Fig 28 Install the external button switch Normally open The ZK1800 is equipped with an interface fo...

Страница 22: ...ctory setting be replaced with a personal code Auto stop function Slowly rotating the sensitivity sensor FORCE ADJ see Fig 24 No 1 and No 2 with a screwdriver 1 sensor can be used to adjust primary op...

Страница 23: ...e stopping verify that the stop is firmly in place and the sensitivity adjustment knob for that gate on the control board is adjusted correctly Adjust counter clockwise to reduce binding Open the gate...

Страница 24: ...Remove obstructions Gate running direction is not correct or gates run in different direction Wiring is incorrect Change the wires V1 and W1 or V2 and W2 If the wiring between two gates is wrong and...

Отзывы: