ZK1800
SWING GATE OPERATOR USER’S MANUAL
19
Table 4 Wiring notes of control board
Position
Function
Remark
1
Force adjustor (for secondary gate-leaf)
The resistance may be increased or
decreased by rotating clockwise or
anticlockwise.
2
Force adjustor (for primary gate-leaf
with electrical lock)
The resistance may be increased or
decreased by rotating clockwise or
anticlockwise.
3
Antenna
4
Receiver panel
5
Power indicator light (LED1)
1206 red
6
Learn indicated light (LED2)
1206 green
7
Learn button
6 mm x 6 mm
8
Beeper
DC12V
9
Set auto close function (SW)
10
External button switch/keypad interface
Connect external button switch/keypad
11
Infrared photocell
Normally open (12V)
12
Limit switch
Normally open
13
Electric lock
DC12V
14
Flashing light
AC240V
15
Fuse
AC250V: 5x20 10A
16
Secondary
motor
(for
secondary
gate-leaf)
17
Primary motor (for primary gate-leaf
with electrical lock)
18
Power supply
AC240V
19
Ground
Power (see Fig.25)
Wire a standard grounded plug to your control board using standard electricians wiring practices.
Wire the opposite end of this cable to the
‘ ’, ‘N’, ‘L’ contacts of the control board. Connect L to the
power line, N to the neutral line, and
‘ ’ to the earth line.
Motor (see Fig.25)
Connect primary motor that on the primary gate (with electric lock) to ‘U1’, ‘V1’, ‘W1’. Connect
secondary motor to ‘U2’, ‘V2’ and ‘W2’.