SWING GATE OPERATOR USER’S MANUAL
16
Fig.20
Install the control box
The control box circuit should be equipped with breaker (10A).
Make sure that power is OFF before making any electrical connections.
Place the control box in the desired mounting position, open the cover of the control box,
remove the control board, mark the mounting holes, and install the control box, fix the control
board back to the box. See Fig.21
Perform the wiring.
Note:
we regard the gate with the electrical lock as the primary gate, the other gate as the
secondary gate.
223
138
Fig.21 Control box mounting size
10. Electrical / Main Terminal Wiring
Note: following is wiring
of ‘pull to open’ configurations. For ‘push to open’, please exchange
the motor wires
‘V1’ and ‘W1’, ‘V2’ and ‘W2’, exchange the limit switch wries ‘OP1’ and ‘CL1’,
‘OP2’ and ‘CL2’.
Connecting
Open the wiring terminal block cover, connect the gate operator to the control box as shown in table
3 and Fig.22, ensue that the wires and terminals match colors.
In order to prevent rainwater from entering main unit, remember to bend the cables downwards as
shown in Fig.23.