– 116 –
7
TEST
OPERATION
7-1. Procedure and Summary of Test Operation
A test operation is executed with the following procedure. When problems or an error occurs at any step, remove
the causes of the problem or error referring to “8 TROUBLESHOOTING.”
Checks before test operation
Check that the main
power supply is turned
on.
Check basic items, mainly the installation work.
Be sure to enter the check results in checklist 1 and 2.
This check is done after the power has been turned on.
Check that the refrigerant circuit system is turned on normally.
Set up the addresses.
Start the address setup in the outdoor/indoor units.
Note: Operation does not start simply by powering-on.
Test operation
END
Carry out a test operation. Check air blowing and
cooling/heating operation in the indoor unit.
Содержание MMY-MAP0804HT7JP
Страница 23: ... 22 1 Wiring Diagrams 1 1 Outdoor Unit Models MMY MAP0804 MAP1004 and MAP1204 ...
Страница 24: ... 23 Models MMY MAP1404 and MAP1604 ...
Страница 35: ... 34 1 2 10 Slim Duct Type AP024 AP027 Models MMD AP0244SPH MMD AP0274SPH ...
Страница 38: ... 37 1 2 13 High Wall Type 3 series Models MMK AP0073H AP0093H AP0123H AP0153H AP0183H AP0243H ...
Страница 52: ... 51 2 5 Parts Layout in Outdoor Unit 8 10 12HP Model MMY MAP0804 MAP1004 MAP1204 ...
Страница 53: ... 52 14 16HP Model MMY MAP1404 MAP1604 ...
Страница 57: ... 56 2 7 2 Inverter P C board for compressor MCC 1596 A3 IPDU ...
Страница 323: ......