e-STUDIO163/166/203/206
© 2005 - 2009 TOSHIBA TEC CORPORATION All rights reserved
ADJUSTMENT
3 - 32
[A] Installation of the high-voltage transformer jig
(1) Open the bypass tray, ADU and transfer
cover.
(2) Open the front cover and take off the toner
cartridge.
(3) Disconnect 1 connector. Loosen 2 screws
and pull out the process unit.
Note:
Note:
Be careful not to let the connector and the
harness be caught when installing the pro-
cess unit after adjustment.
Fig. 3-15
(4) Install the high-voltage transformer jig and fix
it with 2 screws.
Note:
Note:
Be careful not to let the connector and the
harness be caught.
Fig. 3-16
(5) Fix the green cable of the high-voltage trans-
former jig to the frame of the equipment.
Fig. 3-17
Connector
Process unit
High-voltage transformer jig
Green cable
Screw
Содержание e-STUDIO163
Страница 6: ......
Страница 10: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved CONTENTS 4 ...
Страница 12: ......
Страница 142: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved ADJUSTMENT 3 58 ...
Страница 160: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved PREVENTIVE MAINTENANCE PM 4 18 ...
Страница 208: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved TROUBLESHOOTING 5 48 ...
Страница 230: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved POWER SUPPLY UNIT 7 4 ...
Страница 232: ...e STUDIO163 166 203 206 2005 2009 TOSHIBA TEC CORPORATION All rights reserved WIRE HARNESS CONNECTION 8 2 ...
Страница 236: ......
Страница 237: ......