4200FA XT 80kVA Installation and Operation Manual
The Instructions contained in this manual are not intended to cover all of
the details or variations in equipment or to provide for every possible
contingency to be met in connection with installation, operation, or
maintenance. Should further information be required or should particular
problems arise which are not covered sufficiently the matter should be
referred to the local TOSHIBA sales office.
The contents of this instruction manual shall not become a part of or
modify any prior or existing equipment, commitment, or relationship. The
sales contract contains the entire obligation of TOSHIBA
INTERNATIONAL CORPORATION. The warranty contained in the
contract between the parties is the sole warranty of TOSHIBA, and any
statements contained herein do not create new warranties or modify the
existing warranty.
Any Electrical or mechanical modifications to this equipment
without prior written consent of the TOSHIBA will void all
warranties and may void UL/CUL listing. Unauthorized
modifications may also result in equipment damage, personal
injury, or loss of life.
IMPORTANT NOTICE
UNINTERRUPTIBLE POWER SYSTEM
If additional information or technical assistance is required call TOSHIBA
Customer Support Center toll free at 1- 877-867-8773, or write to: Toshiba
International Corporation, 13131 West Little York Road, Houston, TX 77041-
9990 Attn: UPS Product Manager.
Please complete the following information for your records. Unless otherwise
specified on the warranty card, the warranty period for the UPS or UPS part
is 36 months from the shipment date (see bill of lading).
Unless otherwise specified on the warranty card, the warranty period for a
UPS battery is 24 months from the shipment date (see bill of lading).
Keep this manual with the UPS equipment.
Job Number:
Model Number:
Serial Number:
Application:
Shipping Date:
Date of Installation:
Inspected By:
Содержание 4200FA XT
Страница 2: ...4200FA XT 80kVA Installation and Operation Manual ...
Страница 4: ...4200FA XT 80kVA Installation and Operation Manual ...
Страница 67: ......