TH2683A Operation Manual
Ver.1.3
20
Figure 3
‐
4 Test connection program
NOTE:
There is voltage output in HV (
‐
) terminal. Please connect the DUT in discharge
condition.
Beware of electric shock.
Be sure to connect the DUT with polarity (electrolytic condenser, etc.) according to the
positive and negative terminals shown in the program, otherwise it may result in the
explosion of components. Take it down after discharging for a few seconds to prevent
electric shock.
Short circuit of the instrument for a long time is not allowed; otherwise it will damage
the instrument.
In order to obtain ideal accuracy and stability, the test environment must first be
guaranteed according to the condition described in the Chapter One
‐‐‐
“Environment”.
3.4.2
Operation Process
1.
Press TEST key to enter the test status.
2.
Press DISCH. Key to finish testing and return to discharge condition.
The specific steps are as follow:
Where, the HV mark will blink in the three steps of charging, waiting and testing. The DICH mark
will blink when discharging. In addition, the three steps of charging, waiting and testing (when
the DICH TIME is set as 0s, only press the DISCH key, the system changes from test status to
discharge status) can be set as ON or OFF.