![Tolis Group bruAPP Скачать руководство пользователя страница 40](http://html1.mh-extra.com/html/tolis-group/bruapp/bruapp_administrators-manual_1125235040.webp)
Prior to erasing the RAID array, two warning dialogs will be displayed (figures 8.14 and 8.15) alerting
the user to what is going to happen to the bruAPP RAID.
Figure 8.14 — The first bruAPP/OS RAID array erase warning.
Figure 8.15 — The second bruAPP/OS RAID array erase warning.
Both of the screens will default to “Cancel” in an effort to prevent an accidental erase of the bruAPP
RAID array.
Warning
DO NOT power off, reset, unplug, or cut power to the bruAPP in any way when
performing a rebuild of the RAID. Doing so may leave the bruAPP in an unusable
state, thus requiring the unit to the returned to TOLIS Group for non-warranty repair.
If the erase process is instructed to proceed, the following steps are taken:
1. The BRU Server Server daemon is stopped. Any running backups will be terminated at once.
2. The bruAPP/OS will stop the RAID monitor.
3. The bruAPP/OS will unmount the RAID from the system.
40