background image

3  

24 MONTH WARRANTY 

Titan Air hereby warrants its products against defects in material and workmanship for a period 

of (24) twenty four months from date of shipment. 

Start up checklist is due back within (30) thirty days of start-up or 120 days from date of delivery 

for 24 month warranty to be effective.  After (30) thirty days, and up until (60) sixty days, a (13) 
thirteen month warranty will be observed.  All warranties are null and void if start up checklist is not 
received within (60) sixty days from start-up or 120 days from date of delivery.  NO EXCEPTIONS 
WILL BE MADE. 

Titan Air  reserves the right at Titan Air’s option, to replace or repair free of charge, any part 

proven by Titan Air to be defective.  Prompt notification of defective part must be given to Titan Air  
and defective part must be returned freight prepaid within (30) thirty days of notification. 

WARRANTY INCLUDES ONLY PARTS SUPPLIED BY TITAN AIR   INCIDENTAL COSTS AND 

LABOR CHARGES SHALL BE THE RESPONSIBILITY OF OTHERS.  This warranty does not cover 
fuses, belts, filters, refrigerant or water damaged parts which are the result of improper storage or 
installation.   

This warranty is void in event the product is improperly installed and/or operated under 

conditions other than normal published ratings, improperly maintained, misused or not in compliance 
with applicable codes or not in accordance with Titan Air’s operating instructions. 

This warranty is void if attempts to correct or repair any alleged defective part or parts are made 

by unauthorized personnel without Titan Air’s written approval. 

In no event shall Titan Air be held liable for any damage, incidental or consequential, arising from 

the installation, performance or operation of the product.   

This warranty supersedes, voids, and/or is in lieu of any other verbal or written understanding 

which may not be in total accordance with this expressed warranty. 

Warranted parts must be returned to Titan Air  within 60 days to receive credit. 

Purchased components such as Steam Generators Systems, Electric Coils, Refrigerant 

Condensers, Chillers, Coils, Heat Exchangers are covered under the original equipment 
manufacturer’s warranty. 

The burner and heat exchanger is factory set at safe operating conditions, attempting to over fire 

the burner can cause damage to the exchanger, reduce its operating life, and void the warranty. 

 

Start up of equipment with power burners are to be done by burner manufacture trained 

service technicians only for heat exchanger warranty. 

Содержание TA-109

Страница 1: ......

Страница 2: ......

Страница 3: ...void in event the product is improperly installed and or operated under conditions other than normal published ratings improperly maintained misused or not in compliance with applicable codes or not...

Страница 4: ...rvation and are not intended to supplant requirements of federal state or local codes having jurisdiction These codes should be reviewed before installation of equipment All equipment must be installe...

Страница 5: ...8 BLOWER WHEEL 28 PLATE FINNED COIL CLEANING 29 CONDENSATE TRAP 29 GENERAL START UP INFORMATION 30 SPECIFIC EQUIPMENT DETAILS pages not numbered EQUIPMENT SPECIFICATION EQUIPMENT DRAWING SEQUENCE OF O...

Страница 6: ...ondensation Also check for damage caused by rodents and be sure to eliminate any dust that may have built up on the components while the equipment was in storage LONG TERM STORAGE Please observe the f...

Страница 7: ...otor sheave However some equipment may still utilize a variable pitch motor sheave on motors up to 30 Hp INDIRECT FIRED HEATING BURNER INFORMATION Titan Air Handlers can be equipped with inshot style...

Страница 8: ...es Gas piping and exhaust venting must be sized and installed to comply with applicable codes and standards If in doubt regarding the application of the heater contact a sales representative or the fa...

Страница 9: ...side of the equipment Review the equipment submittal drawing for the correct direction of the coil pull CURBING OUTDOOR MOUNTING The use of a full perimeter curb or mounting rails under the heater is...

Страница 10: ...of the blower A properly designed duct transition from the blower outlet to a larger duct is recommended for long ducts or ducts with numerous elbows The equipment was designed for a specific CFM and...

Страница 11: ...r coil piping is typically arranged to provide counterflow operation supply piping on lower air leaving side of coil and return on upper air entering side See Diagram on the right Verify that equipmen...

Страница 12: ...itional sensor wiring may be required Carefully review the schematic and associated schematic symbol legend Note that legend may be on the parts legend sheet rather than on the schematic If an intake...

Страница 13: ...g Options Recommended option for supporting accessories on a flat roof Other method of installation using sheet metal support legs IMPORTANT Not recommended for any unit larger than 125 model Typical...

Страница 14: ...be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one package of assembly materials provided 1 Apply provided caulk tape to the face of the joint to be bo...

Страница 15: ...ed together caulk the external section seam s to provide a water tight seal IMPORTANT Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty...

Страница 16: ...washers Check all sections of the unit thoroughly for assembly hardware The assembly hardware will be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one p...

Страница 17: ...ction letter on the service side of the unit with the corresponding letter on the other section In addition also refer to the unit submittal drawing for proper assembly order 4 Lift blower section and...

Страница 18: ...TANT Re caulk unit lifting lugs after assembly Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty water damage equipment Unit seam seali...

Страница 19: ...entry of snow rain and include an intake screen to meet ANSI standards Accessories on large equipment may be shipped in two pieces for field assembly As a result two damper actuators may need to be f...

Страница 20: ...h the hood to the filter section except in step five substitute inch bolts in for self taping screws to attach the hood to the filter section 7 After all of the accessories are installed caulk each se...

Страница 21: ...Titan Air highly recommends the discharge damper be mounted so the blades are orientated vertically If possible IMPORTANT Titan Air also highly recommends the discharge damper be mounted at the wall o...

Страница 22: ...d diffuser is supplied by others Support diffuser at two points using field supplied materials See example below Square Tubing DISCHARGE DAMPER Secure turning vanes once adjusted in the field by other...

Страница 23: ...t determine whether the drain pan is under negative or positive pressure DESIGN CONSIDERATION Calculate static pressure at the drain pan for worst case scenario Refer to the diagrams on the next page...

Страница 24: ...1 inch wg B A 5 C A B Pipe Diameter inches Insulation if applicable POSITIVE PRESSURE P TRAP CALCULATIONS D Minimum 1 2 inch E 1 2 inch Maximum Total Static Pressure F D E Pipe Diameter inches Insulat...

Страница 25: ...rocedure once per year FILTERS Dirty or clogged filters will restrict air flow which in turn affects the equipment performance Therefore it is necessary to check filters on a regular basis Several sta...

Страница 26: ...alignment and belt tension are critical to belt and bearing service life Incorrect belt tension or misalignment of sheaves can cause any of the following Premature failure of bearings Premature failur...

Страница 27: ...aves and then re tighten If a face width variation exists measure the difference between each side of the narrowest sheave and adjust until both sides are an equal distance from the straight edge BELT...

Страница 28: ...ns of dirt or moisture lubrication may be required every 6 months to 1 year Refer to website for specific manufacturer cut sheets pertaining to motor bearing maintenance Typical motor bearing lubricat...

Страница 29: ...ll also provide an initial check for pinholes or cracks that may not be visible Refrigerant leak detectors should be utilized for DX coils NOTICE Corrosion or deposits on copper or brazed joints may i...

Страница 30: ...eration per the sequence of operation must be verified Apparent malfunction of a component may be caused by improper supply conditions field wiring errors or other problems unrelated to the component...

Отзывы: