BLOWER BEARINGS 

Bearings must be checked during each periodic maintenance inspection.  Bolts and set screws 

should be checked for tightness and the bearings may need lubrication. 

Refer to website for specific 

manufacturer cut sheets pertaining to bearing maintenance.

 

 

Bearing  Lubricate: 

Any  good quality  lithium  or  lithium  complex  base grease  using mineral  oil 

conforming to NLGI grade 2 consistency and an oil viscosity of 455-1135 SUS at 100˚F (100-250 cSt 
at 40˚C) may be used for re-lubrication.(Only applicable if unit blower bearings are Browning AH(Air 
Handler)) 

 

 

IMPORTANT:  The  following  table  is  intended  only  as  a  guide  to  aid  you  in 
setting up your own schedule. 

LUBRICATION GUIDE FOR BLOWER BEARINGS  

 

MOTOR BEARINGS 

Motor  bearings  in  a  clean  environment  should  be  lubricated  every  2  to  3  years.    Under  more 

severe conditions of dirt or moisture, lubrication may be required every 6 months to 1 year. 

Refer to 

website for specific manufacturer cut sheets pertaining to motor bearing maintenance.

 

 

Typical motor bearing lubrication procedure follows: 

 

Remove fill and drain plugs. 

 

Clean drain port of hard grease (with wire if necessary). 

 

Add grease (cavity should be no more than ½ full.). 

 

Start motor and let run for 10 minutes. 

 

Wipe off any drained grease and replace fill and drain plugs. 

 

 

IMPORTANT:  Avoid  adding  an  excessive  amount  of  grease  since  this  a 
common cause of motor failure. 

 

BLOWER WHEEL 

Ensure that blower hub is securely fastened to shaft.  Inspect blower wheel and blades for signs 

of  damage  or  cracks.    Clean  blades  if  necessary  to  maintain  proper  balance  and  performance.  
Avoid use of excessive grease on blower bearings that can coat fan blades and attract dirt. 

Operating Conditions

 

Bearing Temp. (˚F)

 

Grease Interval

 

Clean    

 

32 – 120

 

6 – 10 ,months

 

120 – 150

 

1 – 3 months

 

150 – 200

 

1 – 4 weeks

 

32 – 150

 

1 – 4 weeks

 

Dirty  

 

150 – 200

 

Daily – 1 week

 

Moisture

 

32 - 200

 

Daily – 1 week

 

Содержание TA-109

Страница 1: ......

Страница 2: ......

Страница 3: ...void in event the product is improperly installed and or operated under conditions other than normal published ratings improperly maintained misused or not in compliance with applicable codes or not...

Страница 4: ...rvation and are not intended to supplant requirements of federal state or local codes having jurisdiction These codes should be reviewed before installation of equipment All equipment must be installe...

Страница 5: ...8 BLOWER WHEEL 28 PLATE FINNED COIL CLEANING 29 CONDENSATE TRAP 29 GENERAL START UP INFORMATION 30 SPECIFIC EQUIPMENT DETAILS pages not numbered EQUIPMENT SPECIFICATION EQUIPMENT DRAWING SEQUENCE OF O...

Страница 6: ...ondensation Also check for damage caused by rodents and be sure to eliminate any dust that may have built up on the components while the equipment was in storage LONG TERM STORAGE Please observe the f...

Страница 7: ...otor sheave However some equipment may still utilize a variable pitch motor sheave on motors up to 30 Hp INDIRECT FIRED HEATING BURNER INFORMATION Titan Air Handlers can be equipped with inshot style...

Страница 8: ...es Gas piping and exhaust venting must be sized and installed to comply with applicable codes and standards If in doubt regarding the application of the heater contact a sales representative or the fa...

Страница 9: ...side of the equipment Review the equipment submittal drawing for the correct direction of the coil pull CURBING OUTDOOR MOUNTING The use of a full perimeter curb or mounting rails under the heater is...

Страница 10: ...of the blower A properly designed duct transition from the blower outlet to a larger duct is recommended for long ducts or ducts with numerous elbows The equipment was designed for a specific CFM and...

Страница 11: ...r coil piping is typically arranged to provide counterflow operation supply piping on lower air leaving side of coil and return on upper air entering side See Diagram on the right Verify that equipmen...

Страница 12: ...itional sensor wiring may be required Carefully review the schematic and associated schematic symbol legend Note that legend may be on the parts legend sheet rather than on the schematic If an intake...

Страница 13: ...g Options Recommended option for supporting accessories on a flat roof Other method of installation using sheet metal support legs IMPORTANT Not recommended for any unit larger than 125 model Typical...

Страница 14: ...be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one package of assembly materials provided 1 Apply provided caulk tape to the face of the joint to be bo...

Страница 15: ...ed together caulk the external section seam s to provide a water tight seal IMPORTANT Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty...

Страница 16: ...washers Check all sections of the unit thoroughly for assembly hardware The assembly hardware will be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one p...

Страница 17: ...ction letter on the service side of the unit with the corresponding letter on the other section In addition also refer to the unit submittal drawing for proper assembly order 4 Lift blower section and...

Страница 18: ...TANT Re caulk unit lifting lugs after assembly Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty water damage equipment Unit seam seali...

Страница 19: ...entry of snow rain and include an intake screen to meet ANSI standards Accessories on large equipment may be shipped in two pieces for field assembly As a result two damper actuators may need to be f...

Страница 20: ...h the hood to the filter section except in step five substitute inch bolts in for self taping screws to attach the hood to the filter section 7 After all of the accessories are installed caulk each se...

Страница 21: ...Titan Air highly recommends the discharge damper be mounted so the blades are orientated vertically If possible IMPORTANT Titan Air also highly recommends the discharge damper be mounted at the wall o...

Страница 22: ...d diffuser is supplied by others Support diffuser at two points using field supplied materials See example below Square Tubing DISCHARGE DAMPER Secure turning vanes once adjusted in the field by other...

Страница 23: ...t determine whether the drain pan is under negative or positive pressure DESIGN CONSIDERATION Calculate static pressure at the drain pan for worst case scenario Refer to the diagrams on the next page...

Страница 24: ...1 inch wg B A 5 C A B Pipe Diameter inches Insulation if applicable POSITIVE PRESSURE P TRAP CALCULATIONS D Minimum 1 2 inch E 1 2 inch Maximum Total Static Pressure F D E Pipe Diameter inches Insulat...

Страница 25: ...rocedure once per year FILTERS Dirty or clogged filters will restrict air flow which in turn affects the equipment performance Therefore it is necessary to check filters on a regular basis Several sta...

Страница 26: ...alignment and belt tension are critical to belt and bearing service life Incorrect belt tension or misalignment of sheaves can cause any of the following Premature failure of bearings Premature failur...

Страница 27: ...aves and then re tighten If a face width variation exists measure the difference between each side of the narrowest sheave and adjust until both sides are an equal distance from the straight edge BELT...

Страница 28: ...ns of dirt or moisture lubrication may be required every 6 months to 1 year Refer to website for specific manufacturer cut sheets pertaining to motor bearing maintenance Typical motor bearing lubricat...

Страница 29: ...ll also provide an initial check for pinholes or cracks that may not be visible Refrigerant leak detectors should be utilized for DX coils NOTICE Corrosion or deposits on copper or brazed joints may i...

Страница 30: ...eration per the sequence of operation must be verified Apparent malfunction of a component may be caused by improper supply conditions field wiring errors or other problems unrelated to the component...

Отзывы: