background image

5  

GENERAL INFORMATION 

PAGE # 

24 MONTH WARRANTY  ........................ 

PURPOSE/ APPLICABILITY ................... 4 

EQUIPMENT ARRIVAL ........................... 6 

STORAGE ................................................ 6 

COMPONENTS ........................................ 7 

INSTALLATION 

PRE-INSTALLATION .............................. 8 

HEAT EXCHANGER VENTING ............... 8 

POSITIONING THE HEATER .................. 8 

CLEARANCE ........................................... 9 

CURBING (OUTDOOR MOUNTING) ...... 9 

INSTALLATION SAFETY ................... 9-10 

DUCTWORK .......................................... 10 

SOUND AND VIBRATION CONTROL .. 10 

WATER, STEAM, & AMMONIA- COIL 

INSTALLATION ...................................... 11-12 

DISCHARGE TEMP SENSOR BULB 

INSTALLATION & WIRING ......................... 12 

FIELD WIRING ....................................... 12 

UNIT AND ACCESSORY INSTALLATION 

UNIT & ACCESSORY SUPPORTING 

OPTIONS...................................................... 13 

SECTION ASSEMBLY-HORIZONTAL14-15 

SECTION ASSEMBLY-VERTICAL .. 16-18 

ACCESSORY INSTALLATION ........ 19-20 

INTAKE DAMPER MOUNTING ............. 21 

DISCHARGE DAMPER MOUNTING ..... 21 

VERTICAL DISCHARGE DIFFUSER 

MOUNTING .................................................. 22 

STEAM COIL- TRAPPING .................... 23 

DRAIN PAN- TRAPPING .................. 23-24 

MAINTENANCE 

GENERAL MAINTENANCE .................. 25 

FILTERS ................................................ 25 

BURNER ................................................ 25 

GENERAL V-BELT DRIVE TIPS ...... 26-27 

BLOWER BEARINGS ............................ 28 

MOTOR BEARINGS ............................... 28 

BLOWER WHEEL .................................. 28 

PLATE FINNED COIL CLEANING ........ 29 

CONDENSATE TRAP ............................ 29 

GENERAL START-UP INFORMATION . 30 

SPECIFIC EQUIPMENT DETAILS 

 ................................ pages not numbered 

EQUIPMENT SPECIFICATION 

EQUIPMENT DRAWING 

SEQUENCE OF OPERATION 

PARTS/ LEGEND SHEET 

SCHEMATIC 

GAS TRAIN / BURNER SPECIFICATION 

COIL PERFORMANCE REPORTS (IF 

APPLICABLE)  

START-UP PROCEDURE 

TROUBLESHOOTING (OPTIONAL) 

SUPPLEMENTAL MANUALS 

EVAPORATIVE COOLER (IF APPLICABLE) 

Note that operating and service manuals are 

occasionally  requested  prior  to  production  of 
equipment.  These manuals will be marked “Pre
-Production Release” on the front cover.   

The  final  copy  of  the  operating  and service 

manual  for  a  specific  equipment  will  be  sent 
with  the  equipment.    Additional  copies  of  the 
manual for a specific equipment are available. 

A detailed equipment specification sheet, 

parts/legend sheet, schematic, sequence of 
operation and start-up procedure are provided 
in the start-up section of each operating and 
service manual generated for a specific 
equipment.  Selected vendor cut sheets on 
components will also be included. 

Содержание TA-109

Страница 1: ......

Страница 2: ......

Страница 3: ...void in event the product is improperly installed and or operated under conditions other than normal published ratings improperly maintained misused or not in compliance with applicable codes or not...

Страница 4: ...rvation and are not intended to supplant requirements of federal state or local codes having jurisdiction These codes should be reviewed before installation of equipment All equipment must be installe...

Страница 5: ...8 BLOWER WHEEL 28 PLATE FINNED COIL CLEANING 29 CONDENSATE TRAP 29 GENERAL START UP INFORMATION 30 SPECIFIC EQUIPMENT DETAILS pages not numbered EQUIPMENT SPECIFICATION EQUIPMENT DRAWING SEQUENCE OF O...

Страница 6: ...ondensation Also check for damage caused by rodents and be sure to eliminate any dust that may have built up on the components while the equipment was in storage LONG TERM STORAGE Please observe the f...

Страница 7: ...otor sheave However some equipment may still utilize a variable pitch motor sheave on motors up to 30 Hp INDIRECT FIRED HEATING BURNER INFORMATION Titan Air Handlers can be equipped with inshot style...

Страница 8: ...es Gas piping and exhaust venting must be sized and installed to comply with applicable codes and standards If in doubt regarding the application of the heater contact a sales representative or the fa...

Страница 9: ...side of the equipment Review the equipment submittal drawing for the correct direction of the coil pull CURBING OUTDOOR MOUNTING The use of a full perimeter curb or mounting rails under the heater is...

Страница 10: ...of the blower A properly designed duct transition from the blower outlet to a larger duct is recommended for long ducts or ducts with numerous elbows The equipment was designed for a specific CFM and...

Страница 11: ...r coil piping is typically arranged to provide counterflow operation supply piping on lower air leaving side of coil and return on upper air entering side See Diagram on the right Verify that equipmen...

Страница 12: ...itional sensor wiring may be required Carefully review the schematic and associated schematic symbol legend Note that legend may be on the parts legend sheet rather than on the schematic If an intake...

Страница 13: ...g Options Recommended option for supporting accessories on a flat roof Other method of installation using sheet metal support legs IMPORTANT Not recommended for any unit larger than 125 model Typical...

Страница 14: ...be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one package of assembly materials provided 1 Apply provided caulk tape to the face of the joint to be bo...

Страница 15: ...ed together caulk the external section seam s to provide a water tight seal IMPORTANT Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty...

Страница 16: ...washers Check all sections of the unit thoroughly for assembly hardware The assembly hardware will be found packaged in either a clear plastic bag or corrugated box NOTICE There may be more than one p...

Страница 17: ...ction letter on the service side of the unit with the corresponding letter on the other section In addition also refer to the unit submittal drawing for proper assembly order 4 Lift blower section and...

Страница 18: ...TANT Re caulk unit lifting lugs after assembly Check all external sheet metal seams for caulk shrinkage and re caulk if necessary Titan Air Inc does not warranty water damage equipment Unit seam seali...

Страница 19: ...entry of snow rain and include an intake screen to meet ANSI standards Accessories on large equipment may be shipped in two pieces for field assembly As a result two damper actuators may need to be f...

Страница 20: ...h the hood to the filter section except in step five substitute inch bolts in for self taping screws to attach the hood to the filter section 7 After all of the accessories are installed caulk each se...

Страница 21: ...Titan Air highly recommends the discharge damper be mounted so the blades are orientated vertically If possible IMPORTANT Titan Air also highly recommends the discharge damper be mounted at the wall o...

Страница 22: ...d diffuser is supplied by others Support diffuser at two points using field supplied materials See example below Square Tubing DISCHARGE DAMPER Secure turning vanes once adjusted in the field by other...

Страница 23: ...t determine whether the drain pan is under negative or positive pressure DESIGN CONSIDERATION Calculate static pressure at the drain pan for worst case scenario Refer to the diagrams on the next page...

Страница 24: ...1 inch wg B A 5 C A B Pipe Diameter inches Insulation if applicable POSITIVE PRESSURE P TRAP CALCULATIONS D Minimum 1 2 inch E 1 2 inch Maximum Total Static Pressure F D E Pipe Diameter inches Insulat...

Страница 25: ...rocedure once per year FILTERS Dirty or clogged filters will restrict air flow which in turn affects the equipment performance Therefore it is necessary to check filters on a regular basis Several sta...

Страница 26: ...alignment and belt tension are critical to belt and bearing service life Incorrect belt tension or misalignment of sheaves can cause any of the following Premature failure of bearings Premature failur...

Страница 27: ...aves and then re tighten If a face width variation exists measure the difference between each side of the narrowest sheave and adjust until both sides are an equal distance from the straight edge BELT...

Страница 28: ...ns of dirt or moisture lubrication may be required every 6 months to 1 year Refer to website for specific manufacturer cut sheets pertaining to motor bearing maintenance Typical motor bearing lubricat...

Страница 29: ...ll also provide an initial check for pinholes or cracks that may not be visible Refrigerant leak detectors should be utilized for DX coils NOTICE Corrosion or deposits on copper or brazed joints may i...

Страница 30: ...eration per the sequence of operation must be verified Apparent malfunction of a component may be caused by improper supply conditions field wiring errors or other problems unrelated to the component...

Отзывы: