44
A79210100 - Iss 2
Shandon ClearVue™ Operator Guide
DRAFT
To shutdown the Shandon ClearVue:
Ensure there are no
Baskets
still in the
instrument.
Ensure the
Dispense Head
is located in the
Dispense Head Cleaning Station
.
Switch the
Mains Power Switch
to the off
‘O’
position.
Note:
Do not switch off the Battery Isolation Switch.
•
•
•
2-16 - Shutdown
Procedure
Содержание Shandon ClearVue A79210100
Страница 96: ...96 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT 5 2 2 Mountant Jar...
Страница 106: ...106 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT To clean the Slip Wiper 5 2 5 Cleaning the Slip Wiper...
Страница 119: ...Shandon ClearVue Operator Guide A79210100 Iss 2 119 DRAFT C2 Packing Instructions...
Страница 120: ...120 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Appendix D Screen Maps A B...
Страница 121: ...Shandon ClearVue Operator Guide A79210100 Iss 2 121 DRAFT A 1 3 2 4 5 1 2 4 3 5 A...
Страница 122: ...122 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT B 1 3 2 4 5 7 6 8 1 3 5 7 2 4 6 8...
Страница 123: ...Shandon ClearVue Operator Guide A79210100 Iss 2 123 DRAFT Appendix E Declaration of Conformity...
Страница 124: ...124 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Index...
Страница 125: ...Shandon ClearVue Operator Guide A79210100 Iss 2 125 DRAFT...