118
A79210100 - Iss 2
Shandon ClearVue™ Operator Guide
DRAFT
When the
Flush
cycle is complete, check that
the
Mountant Bottle Cap
is clear of mountant.
Place the
Dispense Head Cap
over the
Dispense Head Needle
to prevent the xylene
which remains in the system from leaking out
during transit.
Approximately 5ml of xylene will remain in the system - follow
good laboratory practice when packing and unpacking.
Disconnect the
Power Lead
.
Ensure the
Battery Switch
has been set to the
off
‘O’
position.
Follow the
Packing Instructions
on the
following page.
•
•
•
•
•
Содержание Shandon ClearVue A79210100
Страница 96: ...96 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT 5 2 2 Mountant Jar...
Страница 106: ...106 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT To clean the Slip Wiper 5 2 5 Cleaning the Slip Wiper...
Страница 119: ...Shandon ClearVue Operator Guide A79210100 Iss 2 119 DRAFT C2 Packing Instructions...
Страница 120: ...120 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Appendix D Screen Maps A B...
Страница 121: ...Shandon ClearVue Operator Guide A79210100 Iss 2 121 DRAFT A 1 3 2 4 5 1 2 4 3 5 A...
Страница 122: ...122 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT B 1 3 2 4 5 7 6 8 1 3 5 7 2 4 6 8...
Страница 123: ...Shandon ClearVue Operator Guide A79210100 Iss 2 123 DRAFT Appendix E Declaration of Conformity...
Страница 124: ...124 A79210100 Iss 2 Shandon ClearVue Operator Guide DRAFT Index...
Страница 125: ...Shandon ClearVue Operator Guide A79210100 Iss 2 125 DRAFT...