Site Preparation
Dimensions and Weights
2-8
iCAP RQ Pre-Installation Requirements Guide (P/N BRE0009927, Revision A)
Thermo Scientific
11. When the final position for the instrument is reached, slowly lower
the front of the iCAP RQ ICP-MS.
The front three of the six support points beneath the iCAP RQ
ICP-MS consist of synthetic material that has a high frictional
resistance and should keep the instrument safely in position.
12. To remove the lifting devices from the handles, continue with
“Dismounting the Lifting Device and Securing the Handles”
Dismounting the Lifting Device and Securing the Handles
After the iCAP RQ ICP-MS has been moved to the correct position for
operation, dismount the lifting device and store away the handles on the
left side. At the right side of instrument, the handles can also be used to
mount a drip tray.
❖
To dismount the lifting device
1. Unscrew the two clamps (
3
in
) of the lifting device.
2. Dismount the lifting device.
3. Repeat for the lifting device on the other side of the instrument.
4. Store away the clamps, washers (
2
in
) and screws (
1
in
) along with the lifting devices for later use.
Labeled Components: 1=front support points (3 ×) with high resistance to
prevent moving, 2=rear support points (3 ×) with low resistance to easily
slide the system on bench top
Figure 2-6.
Support points with different resistance
1
2
Содержание iCAP RQ ICP-MS
Страница 1: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 2: ...iCAP RQ ICP MS Pre Installation Requirements Guide BRE0009927 Revision A November 2016 ...
Страница 69: ...I 4 iCAP RQ Pre Installation Requirements Guide P N BRE0009927 Revision A Thermo Scientific Index W W ...
Страница 71: ......